Do you have any question about this error?
Message type: E = Error
Message class: CM_ODATA_PP_POR - Messages for Backend Settings of Service prodorder.release
Message number: 004
Message text: Enter a valid interval for the latest start date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CM_ODATA_PP_POR004
- Enter a valid interval for the latest start date ?The SAP error message CM_ODATA_PP_POR004, which indicates "Enter a valid interval for the latest start date," typically arises in the context of planning or scheduling within SAP, particularly when using OData services for production planning (PP) or related modules.
Cause:
This error usually occurs when:
- Invalid Date Input: The user has entered a latest start date that is not valid or does not fall within an acceptable range. This could be due to a date that is in the past, a date format issue, or a date that exceeds the allowed planning horizon.
- Configuration Issues: There may be configuration settings in the system that restrict the range of dates that can be entered.
- Data Consistency: There might be inconsistencies in the data being processed, such as missing or incorrect master data related to the production order or planning parameters.
Solution:
To resolve this error, you can take the following steps:
Check Date Input:
- Ensure that the latest start date you are entering is valid and falls within the acceptable range. It should not be a past date unless your business process allows it.
- Verify that the date format matches the expected format in SAP (e.g., YYYY-MM-DD).
Review Planning Parameters:
- Check the planning parameters and settings in the system to ensure that they allow for the date range you are trying to use. This may involve reviewing configuration settings in the production planning module.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidelines on date inputs for the OData service you are using. This can provide insights into any constraints or requirements.
Data Consistency Check:
- Ensure that all relevant master data (like material master, routing, work center) is correctly maintained and consistent. Inconsistencies can lead to errors during planning.
Testing:
- If possible, test with different valid dates to see if the error persists. This can help isolate whether the issue is with a specific date or a broader configuration problem.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance based on your specific system configuration and business processes.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CM_ODATA_PP_POR003
Only possible to include single values or ranges
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CM_ODATA_PP_POR002
Only production orders scheduled to be released today are selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CM_ODATA_PP_POR005
Only operations scheduled to start latest today are selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CM_ODATA_PP_POR010
Mark exactly one variant as default for user &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.