How To Fix CM_EHFND_CRRF211 - CCI &2 / CRV &3 - CRR recalculation is necessary.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CM_EHFND_CRRF - Messages for PS&S Runtime Framework

  • Message number: 211

  • Message text: CCI &2 / CRV &3 - CRR recalculation is necessary.

  • Show details Hide details
  • What causes this issue?

    Chemical compliance information <ZK>&V2&</> / compliance requirement
    version <ZK>&V3&</> - Recalculation of compliance assessment result is
    necessary.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CM_EHFND_CRRF211 - CCI &2 / CRV &3 - CRR recalculation is necessary. ?

    The SAP error message CM_EHFND_CRRF211 with the description "CCI &2 / CRV &3 - CRR recalculation is necessary" typically indicates that there is a need for recalculation of the Cost Rate Recalculation (CRR) for a specific Cost Center (CCI) and Cost Rate Value (CRV). This error often arises in the context of SAP Controlling (CO) and can be related to various factors, including changes in master data, configuration settings, or inconsistencies in the data.

    Causes:

    1. Changes in Master Data: If there have been changes to the cost center or related master data (e.g., changes in cost elements, activity types, or allocation methods), the system may require a recalculation of the cost rates.

    2. Configuration Changes: Adjustments in the configuration settings for controlling or cost accounting can trigger the need for recalculation.

    3. Data Inconsistencies: Inconsistencies in the data, such as missing or incorrect entries in the relevant tables, can lead to this error.

    4. Period-End Closing Activities: During period-end closing, if certain activities or postings are not completed, it may necessitate a recalculation.

    Solutions:

    1. Recalculate Cost Rates: You can manually trigger the recalculation of cost rates for the affected cost center and cost rate value. This can typically be done through transaction codes like KSS1 (for cost center planning) or KSV5 (for cost center actual data).

    2. Check Master Data: Review the master data for the cost center and ensure that all relevant information is accurate and up to date. This includes checking cost elements, activity types, and any other related configurations.

    3. Review Configuration Settings: Ensure that the configuration settings in the controlling module are correct and align with the business processes.

    4. Run Period-End Closing: If the error occurs during period-end closing, ensure that all necessary activities have been completed. You may need to run the closing programs again.

    5. Consult SAP Notes: Check for any relevant SAP Notes that may address this specific error message. SAP Notes often provide solutions or workarounds for known issues.

    6. Contact SAP Support: If the issue persists after trying the above solutions, consider reaching out to SAP Support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP CO, such as KSS1, KSV5, and KKAO (for actual costing).
    • Documentation: Review SAP documentation related to cost center accounting and cost rate calculations for a deeper understanding of the processes involved.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to address the error message CM_EHFND_CRRF211 effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author