Do you have any question about this error?
Message type: E = Error
Message class: CM_BOMBOS - BOMBOS
Message number: 053
Message text: Item material &1 is assigned to more than one specification
The material for the bill of material item &v2&-&v3& is assigned to
more than one specification. Only one specification may be assigned for
the generation of specification data.
The system cannot create a composition for the bill of material because
of the multiple material-specification assignment.
Make sure that the items in the bill of material are only assigned to
<ZH>one</> specification before the composition is generated, otherwise
errors will occur in the generation and you will have to repeat the
process.
Error message extract from SAP system. Copyright SAP SE.
CM_BOMBOS053
- Item material &1 is assigned to more than one specification ?The SAP error message CM_BOMBOS053 indicates that a specific item material (denoted as &1) is assigned to more than one specification in the system. This situation typically arises in the context of managing materials and their specifications in SAP, particularly within the SAP Environment, Health, and Safety (EHS) module or the Product Lifecycle Management (PLM) module.
Cause:
- Multiple Specifications: The item material has been assigned to multiple specifications, which can lead to confusion regarding which specification should be used for various processes (e.g., production, quality control).
- Data Entry Errors: There may have been an error during data entry or configuration, leading to the same material being linked to multiple specifications unintentionally.
- System Configuration: The system may not be configured correctly to handle the relationships between materials and specifications.
Solution:
- Review Specifications: Check the specifications assigned to the item material. You can do this by navigating to the relevant transaction codes (e.g., C202 for specifications) and reviewing the specifications linked to the material.
- Remove Duplicates: If the material is indeed assigned to multiple specifications, determine which specification is the correct one to use and remove the unnecessary assignments. This can be done by editing the material's specification assignments.
- Consult Documentation: Refer to your organization's documentation or SAP help resources to understand the correct process for managing material specifications.
- Data Cleanup: If this issue is widespread, consider performing a data cleanup to ensure that materials are not incorrectly assigned to multiple specifications across the system.
- User Training: Provide training to users involved in material specification management to prevent future occurrences of this issue.
Related Information:
By addressing the root cause of the error and ensuring proper assignment of specifications to materials, you can resolve the CM_BOMBOS053 error and maintain data integrity within your SAP system.
Get instant SAP help. Start your 7-day free trial now.
CM_BOMBOS052
Item material &1 is not assigned to a specification
What causes this issue? No specification is assigned to the material in the BOM item &v2&-&v3&.System Response The system cannot cre...
CM_BOMBOS051
Value assignment type &1 is invalid
What causes this issue? The SAP System has selected the value assignment type &v1& from Customizing. However, the value assignment type does ...
CM_BOMBOS060
--------------------------- Dialog messages -----------------------------
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CM_BOMBOS061
Select error entries
What causes this issue? You have not selected any error entries.System Response The system cancels the <LS>reset error entry</> function...
Click on this link to search all SAP messages.