How To Fix CM302 - The component is already allocated to an operation.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CM - Task list messages: Material component allocations

  • Message number: 302

  • Message text: The component is already allocated to an operation.

  • Show details Hide details
  • What causes this issue?

    The material component that you want to allocate to the operation has
    already been allocated to another operation.

    How to fix this error?

    You can only carry out the new allocation if you delete the existing
    one.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CM302 - The component is already allocated to an operation. ?

    The SAP error message CM302 ("The component is already allocated to an operation") typically occurs in the context of production planning and control, particularly when dealing with production orders and their components. This error indicates that a specific component (material) is already assigned to another operation within the same production order or possibly to a different order.

    Causes:

    1. Duplicate Allocation: The component has already been allocated to another operation in the same production order.
    2. Incorrect Order of Operations: The system may be trying to allocate a component before it has been released or before the previous operation has been completed.
    3. Configuration Issues: There may be issues with the configuration of the production order or the bill of materials (BOM) that lead to conflicts in component allocation.
    4. User Error: Manual errors during the allocation process, such as trying to allocate the same component multiple times.

    Solutions:

    1. Check Allocation: Review the production order and check which operations the component is already allocated to. You can do this by navigating to the production order details and examining the operations and their assigned components.
    2. Reallocate Components: If the component is incorrectly allocated, you may need to deallocate it from the current operation and reallocate it to the correct one.
    3. Review BOM and Routing: Ensure that the bill of materials and routing for the production order are correctly set up. If there are discrepancies, correct them in the system.
    4. Use Transaction Codes: Utilize transaction codes like CO02 (Change Production Order) to manage the allocation of components effectively.
    5. Check for Open Operations: Ensure that all previous operations are completed before trying to allocate components to subsequent operations.
    6. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling component allocation issues.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CO01 (Create Production Order), CO02 (Change Production Order), and CO03 (Display Production Order).
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles and Permissions: Ensure that the user has the necessary permissions to allocate components to operations.
    • Training and Support: If the issue persists, consider reaching out to your SAP support team or consulting with a SAP expert for further assistance.

    By following these steps, you should be able to resolve the CM302 error and ensure proper allocation of components in your production orders.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker