Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CM - Task list messages: Material component allocations
Message number: 004
Message text: There is no allocation of material to a task list.
You are attempting to allocate material components to an operation.
However, there is no material to be produced and thus no bill of
material allocated to the routing. For this reason, you cannot allocate
material components to the operation.
To allocate material components to an operation, first allocate the
desired material to the routing in the overview.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
To do this, select the menu options -> Goto -> Header overview and thenError message extract from SAP system. Copyright SAP SE.
CM004
- There is no allocation of material to a task list. ?The SAP error message CM004 ("There is no allocation of material to a task list") typically occurs in the context of production planning and control, particularly when working with task lists (such as routing or production orders) that require specific materials for execution. Here’s a breakdown of the cause, potential solutions, and related information for this error:
Cause:
- Missing Material Allocation: The task list (routing) does not have any materials assigned to it. This can happen if the task list was created without specifying the necessary materials.
- Incorrect Task List: The task list being referenced may not be the correct one for the material or production order you are trying to process.
- Material Master Data Issues: The material master data may not be properly set up, leading to a lack of linkage between the material and the task list.
- Task List Status: The task list may be in a status that does not allow for material allocation (e.g., inactive or deleted).
- Configuration Issues: There may be configuration issues in the system that prevent the proper allocation of materials to task lists.
Solutions:
- Check Task List: Verify that the task list you are using has the necessary materials allocated. You can do this by navigating to the task list in the SAP system and checking the components section.
- Create/Update Task List: If the task list does not have materials allocated, you may need to create a new task list or update the existing one to include the required materials.
- Review Material Master: Ensure that the material master data is correctly set up and that the materials are linked to the appropriate task lists.
- Check Task List Status: Make sure that the task list is active and not in a status that would prevent material allocation.
- Consult Configuration: If you suspect a configuration issue, consult with your SAP configuration team to ensure that the system is set up correctly for material allocation to task lists.
- Use Transaction Codes: Utilize relevant transaction codes such as
CA01
(Create Routing),CA02
(Change Routing), orCA03
(Display Routing) to manage task lists and their material allocations.Related Information:
MM01
(Create Material), MM02
(Change Material), and MM03
(Display Material).By following these steps, you should be able to identify the cause of the CM004 error and implement the necessary solutions to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
CM003
Enter material and plant
What causes this issue? You are attempting to allocate material components. To allocate components, you must enter the bill of material from which yo...
CM002
You cannot allocated material components to referenced operations.
What causes this issue? You cannot allocate material components to an operation which is referenced from a reference operation set.How to fix this er...
CM005
Enter plant for standard BOM.
What causes this issue? You want to call a standard bill of material for a standard network. You have to enter a plant because the standard bill of m...
CM010
You have no authorization for maintaining bills of material.
What causes this issue? You cannot change or display the bill of material because you do not have the corresponding authorization.How to fix this err...
Click on this link to search all SAP messages.