Do you have any question about this error?
Message type: E = Error
Message class: CM - Task list messages: Material component allocations
Message number: 001
Message text: You cannot allocate material components to sub-operations.
Material components can only be allocated to operations.
Allocate the material component to the operation to which the
sub-operation belongs. Make a note on the allocation in the long text
for the operation.
Error message extract from SAP system. Copyright SAP SE.
CM001
- You cannot allocate material components to sub-operations. ?The SAP error message CM001, which states "You cannot allocate material components to sub-operations," typically occurs in the context of production planning and control when trying to allocate materials to specific sub-operations in a production order. Here are the potential causes, solutions, and related information for this error:
Causes:
Sub-Operation Configuration: The sub-operation may not be configured to allow material allocation. This can happen if the sub-operation is not set up correctly in the routing or if it is not defined to require components.
Missing Component Assignment: The material components may not be assigned to the specific sub-operation in the routing or bill of materials (BOM).
Status of the Production Order: The production order may be in a status that does not allow for material allocation, such as "TECO" (Technically Completed) or "CLOSE".
Component Availability: The components may not be available in the required quantity or may not be in stock.
Incorrect Production Order Type: The production order type may not support the allocation of materials to sub-operations.
Solutions:
Check Routing and BOM: Verify that the routing for the production order includes the necessary sub-operations and that the required components are assigned to those sub-operations.
Review Production Order Status: Ensure that the production order is in a status that allows for material allocation. If it is in a restricted status, you may need to change it to a status that allows for allocation.
Adjust Sub-Operation Settings: If the sub-operation is not set up to allow material allocation, you may need to adjust the settings in the routing or the production order.
Check Component Availability: Ensure that the required materials are available in stock and that the quantities are sufficient for the production order.
Consult Documentation: Review SAP documentation or consult with your SAP support team for specific configuration settings related to your production environment.
Related Information:
CO02
(Change Production Order) to check the status and details of the production order, and C202
(Change Routing) to review the routing details.If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.
Get instant SAP help. Start your 7-day free trial now.
CM000
Routing not found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CL_TM_SIC_FWS_INT053
Table &1 has entries without billing document type.See note &2
What causes this issue? You have maintained an entry in customizing table TCM_C_SLS_MAP without specifying the billing document type.System Response ...
CM002
You cannot allocated material components to referenced operations.
What causes this issue? You cannot allocate material components to an operation which is referenced from a reference operation set.How to fix this er...
CM003
Enter material and plant
What causes this issue? You are attempting to allocate material components. To allocate components, you must enter the bill of material from which yo...
Click on this link to search all SAP messages.