How To Fix CL_PS_MD_MSG014 - Refreshed successfully


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CL_PS_MD_MSG - Messages for Project Editor

  • Message number: 014

  • Message text: Refreshed successfully

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CL_PS_MD_MSG014 - Refreshed successfully ?

    The SAP error message CL_PS_MD_MSG014 with the text "Refreshed successfully" is not actually an error message but rather an informational message indicating that a refresh operation has been completed successfully. This message typically appears in the context of SAP Project System (PS) or related modules where data is being refreshed or updated.

    Cause:

    • The message is triggered when a refresh operation is executed, such as refreshing project data, planning data, or other related information in the SAP system.
    • It indicates that the system has successfully completed the refresh process without any issues.

    Solution:

    Since this message is informational and does not indicate an error, no specific action is required. However, if you are expecting a different outcome or if you are facing issues related to the data that was supposed to be refreshed, consider the following steps:

    1. Verify Data: Check the data that was supposed to be refreshed to ensure it reflects the expected changes.
    2. Review Logs: If there are any concerns about the refresh process, review the logs or any related messages that may provide additional context.
    3. Consult Documentation: Refer to SAP documentation or help resources for more information on the specific refresh operation you are performing.
    4. Contact Support: If you encounter issues beyond this message, consider reaching out to your SAP support team for further assistance.

    Related Information:

    • SAP Project System (PS): This module is used for managing projects, including planning, execution, and monitoring.
    • Refresh Operations: These can include refreshing project plans, budgets, or other related data in the system.
    • Message Class: The message belongs to a specific message class in SAP, which can be looked up for more details on related messages.

    If you have specific concerns or issues related to the context in which this message appears, please provide more details for tailored assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author