Do you have any question about this error?
Message type: E = Error
Message class: CKWB - Production lot costing messages
Message number: 013
Message text: Production lot & has an activated cost estimate.
You are costing production lot &v1& with
material &v2& in plant &v3& by version &v4&.
This production lot has an activated cost estimate for this
cost variant and version.
The production lot is not costed, because an activated price has
already existed.
You must use a different costing variant or version if you want to
cost the production lot again.
Error message extract from SAP system. Copyright SAP SE.
CKWB013
- Production lot & has an activated cost estimate. ?The SAP error message CKWB013 indicates that there is an issue with a production lot that has an activated cost estimate. This error typically arises in the context of product costing and inventory management within the SAP system. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Activated Cost Estimate: The error suggests that the production lot in question has an activated cost estimate, which means that the cost calculation for that lot has been finalized and is currently in use.
- Changes to Costing: If there are attempts to make changes to the production lot or its associated cost estimate (e.g., trying to change the material, quantity, or other parameters), the system will prevent this action because the cost estimate is already activated.
- Inconsistent Data: There may be inconsistencies in the data related to the production lot, such as discrepancies between the cost estimate and the actual costs incurred.
Solution:
- Review Cost Estimate: Check the cost estimate associated with the production lot. Ensure that it is correct and reflects the current situation. If necessary, you may need to create a new cost estimate.
- Deactivate Cost Estimate: If you need to make changes to the production lot, consider deactivating the current cost estimate. This can be done through the appropriate transaction codes (e.g., CK24 for deactivating cost estimates).
- Adjust Production Lot: If the production lot needs to be adjusted, ensure that all necessary changes are made before reactivating or creating a new cost estimate.
- Consult Documentation: Refer to SAP documentation or help files for specific transaction codes and procedures related to cost estimates and production lots.
- Check Authorizations: Ensure that you have the necessary authorizations to make changes to cost estimates and production lots.
Related Information:
By following these steps, you should be able to address the CKWB013 error and manage your production lots and cost estimates effectively.
Get instant SAP help. Start your 7-day free trial now.
CKWB012
No cost data found for production lot from &.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKWB011
Cost Element not found ! Check the input.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKWB014
The REDO-MODUS was activated!
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKWB015
Cost estimate for prod.-lot &1 of material &2 in plant &3 deactivated.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.