Do you have any question about this error?
Message type: E = Error
Message class: CKMLWIP - WIP Price Determination
Message number: 009
Message text: Costing run &1 &2 &3 is not relevant for WIP
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CKMLWIP009
- Costing run &1 &2 &3 is not relevant for WIP ?The SAP error message CKMLWIP009 indicates that a costing run is not relevant for Work in Progress (WIP) calculations. This error typically arises during the execution of a costing run in the Material Ledger when the system determines that the specified costing run does not meet the criteria for WIP processing.
Causes:
- Costing Run Configuration: The costing run may not be configured to include WIP calculations. This can happen if the settings in the controlling area or the material ledger are not properly set up.
- Material Master Settings: The material master records may not be set up to allow for WIP calculations. This includes settings related to valuation classes and costing variants.
- Period Closing: The period for which the costing run is being executed may be closed, preventing any WIP calculations from being processed.
- No WIP Relevant Transactions: There may not be any transactions that would generate WIP for the specified period, leading the system to determine that the costing run is not relevant for WIP.
Solutions:
- Check Costing Run Configuration: Review the configuration of the costing run in the controlling area. Ensure that the settings allow for WIP calculations.
- Review Material Master Data: Check the material master records for the relevant materials. Ensure that the valuation class and other settings are appropriate for WIP calculations.
- Open Periods: Ensure that the period for which you are trying to execute the costing run is open. If it is closed, you may need to reopen it or execute the costing run for an open period.
- Verify Transactions: Check if there are any relevant transactions that would generate WIP. If there are none, the costing run may not be necessary for that period.
- Consult Documentation: Refer to SAP documentation or help resources for specific configuration settings related to WIP and costing runs.
Related Information:
By following these steps, you should be able to identify the cause of the CKMLWIP009 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CKMLWIP008
You want to activate the WIP revaluation. Refer to the long text
What causes this issue? The WIP revaluation function has not been released for general use. You can only activate it by entering a password.How to fi...
CKMLWIP007
WIP Revaluation is not active in plant &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKMLWIP011
Update CKMLLACR with return code = & failed
What causes this issue? An internal error occurred.System Response The system issues an error message and will not allow you to continue with this t...
CKMLWIP050
WIP revaluation is not allowed for periods &1/&2 in plant &3
What causes this issue? You want to complete WIP revaluation in plant &v3& for periods &v1& / &v2&. You can only complete WIP...
Click on this link to search all SAP messages.