Do you have any question about this error?
Message type: E = Error
Message class: CKCC - Messages in the Costing Run Cockpit
Message number: 134
Message text: Plant &1 is not assigned to the set controlling area &2
Plant &v1& is assigned to controlling area &v3&. Since you are
currently working in controlling area &v2&, you can only choose plants
that are assigned to this controlling area.
The function cannot be executed.
Enter a different plant, or set the controlling area to &v3&.
Error message extract from SAP system. Copyright SAP SE.
CKCC134
- Plant &1 is not assigned to the set controlling area &2 ?The SAP error message CKCC134 indicates that a specific plant (denoted as &1) is not assigned to the controlling area (denoted as &2) in the system. This error typically arises in the context of cost controlling and management accounting when trying to perform operations that require a valid assignment between a plant and a controlling area.
Cause:
- Missing Assignment: The primary cause of this error is that the plant you are trying to use is not linked to the specified controlling area in the system.
- Configuration Issues: There may be configuration issues in the system where the plant was not properly assigned to the controlling area during the setup.
- Data Migration Issues: If data was migrated from another system, the assignment might not have been carried over correctly.
Solution:
To resolve this error, you need to ensure that the plant is correctly assigned to the controlling area. Here are the steps to do this:
Check Plant and Controlling Area Assignment:
- Go to the SAP transaction code SPRO (Customizing).
- Navigate to Controlling > Cost Center Accounting > Master Data > Cost Centers > Assign Plants to Controlling Areas.
- Verify if the plant in question is listed under the specified controlling area.
Assign the Plant to the Controlling Area:
- If the plant is not assigned, you can add it by selecting the appropriate controlling area and then assigning the plant.
- Save your changes.
Verify Other Configurations:
- Ensure that other related configurations, such as cost center assignments and profit center assignments, are also correctly set up.
Testing:
- After making the necessary assignments, test the transaction or process that previously generated the error to confirm that it has been resolved.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP Basis or functional team for further investigation, as there may be additional underlying issues affecting the assignment.
Get instant SAP help. Start your 7-day free trial now.
CKCC133
Quantity structure control: BOM application missing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKCC131
Costs displayed are based on costing lot size
What causes this issue? The cost estimate was carried out without reference to a planning scenario. Consequently you cannot select the setting produc...
CKCC135
Specify costing variant or make generic entry
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKCC136
Cost estimate not transferred due to different cost component structure
What causes this issue? You are trying to copy a cost estimate into another one by using a template. The system determined that cost component struct...
Click on this link to search all SAP messages.