How To Fix CKBK018 - No cost estimate used to valuate costing item &1


CKBK018 - Overview

  • Message type: E = Error

  • Message class: CKBK - Messages of the Valuation Functions

  • Message number: 018

  • Message text: No cost estimate used to valuate costing item &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CKBK018 - No cost estimate used to valuate costing item &1 ?
    The SAP error message CKBK018 ("No cost estimate used to valuate costing item &1") typically occurs in the context of cost accounting and product costing within the SAP system. This error indicates that the system is unable to find a valid cost estimate for the specified costing item, which prevents it from valuating the item correctly.
    Causes:
    
    Missing Cost Estimate: The most common cause is that there is no cost estimate available for the specified item in the system.
    Costing Variant Issues: The costing variant used may not be configured correctly or may not be applicable to the item in question.
    Costing Version: The costing version being used may not have been released or may not be valid for the period in which the valuation is being attempted.
    Item Not Marked for Costing: The item may not be marked for costing in the material master or may not have been included in the relevant costing

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant