Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 642
Message text: Material &2: Dummy profit center used for partner determination
<DS:GLOS.3526B73AAFAB52B9E10000009B38F974>Partner version</> &V1&
requires a profit center to be determined. However, no profit center is
assigned to material &V2& in plant &V3&.
&system_response&
To determine the partner, the dummy profit center is used from
controlling area &V4&.
Assign a profit center to material &V2& in plant &V3& if you do not
want the dummy profit center to be assigned.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
<DS:TRAN.MM02>Change material</>Error message extract from SAP system. Copyright SAP SE.
CK642
- Material &2: Dummy profit center used for partner determination ?The SAP error message CK642 ("Material &2: Dummy profit center used for partner determination") typically occurs in the context of controlling and profitability analysis when a material is being processed, and the system identifies that a dummy profit center is being used for partner determination. This can happen in various scenarios, such as during the creation of a material master, when performing a goods movement, or when executing a costing run.
Cause:
The error is generally caused by the following reasons:
- Dummy Profit Center: The system is trying to use a dummy profit center (often a placeholder or default value) for the material, which is not valid for the transaction being processed.
- Missing Configuration: The profit center assignment for the material or the related master data (like the cost center or internal order) may not be properly configured.
- Material Master Data Issues: The material master may not have the necessary profit center or controlling area data filled in correctly.
Solution:
To resolve the CK642 error, you can take the following steps:
Check Material Master Data:
- Go to the material master record (transaction code MM03) and check the accounting view. Ensure that the profit center is correctly assigned and not set to a dummy value.
Review Profit Center Configuration:
- Ensure that the profit center configuration is correct in the controlling area. You can check this in the configuration settings (transaction code SPRO) under:
- Controlling ? Profit Center Accounting ? Master Data ? Maintain Profit Center.
Update Partner Determination:
- If the error occurs during partner determination, check the settings for partner determination in the relevant configuration. Ensure that the correct profit center is being used for the partner determination process.
Check Cost Center Assignment:
- If the material is linked to a cost center, ensure that the cost center is valid and has a proper profit center assigned.
Consult with Functional Team:
- If you are unsure about the configuration or the implications of changing settings, consult with your SAP functional team or a consultant who specializes in controlling and profitability analysis.
Testing:
- After making the necessary changes, perform a test transaction to ensure that the error no longer occurs.
Related Information:
By following these steps, you should be able to identify the root cause of the CK642 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CK641
Material &2: Profit center cannot be determined.
What causes this issue? Partner version &V1& requires a profit center to be determined. However, no profit center is assigned to material &am...
CK640
Marked cost estimate cannot be changed
What causes this issue? A marked cost estimate for this order item already exists in the database; it may have been used to valuate sales order or pr...
CK643
Mat. no. &2: Business area could not be determined.
What causes this issue? <DS:GLOS.3526B73AAFAB52B9E10000009B38F974>Partner version</> &V1& requires a business area to be determin...
CK644
Material &1 in plant &2: apportionment structure &3 will be used
What causes this issue? The joint production process is costed using material &V1& in plant &V2&. However, there are no production ve...
Click on this link to search all SAP messages.