How To Fix CK596 - Number of cost estimates executed &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 596

  • Message text: Number of cost estimates executed &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CK596 - Number of cost estimates executed & ?

    The SAP error message CK596 typically indicates that there is an issue with the number of cost estimates that have been executed for a particular material or product. This message is often encountered in the context of the Costing module in SAP, particularly when dealing with cost estimates for materials.

    Cause:

    The error message CK596 can occur due to several reasons, including:

    1. Exceeding Limit: The system has a predefined limit on the number of cost estimates that can be executed for a material. If this limit is exceeded, the error will be triggered.
    2. Configuration Issues: There may be configuration settings in the costing variant or in the material master that restrict the number of cost estimates.
    3. Data Integrity Issues: There could be inconsistencies or issues with the data related to the material or cost estimates that are causing the error.

    Solution:

    To resolve the CK596 error, you can take the following steps:

    1. Check Cost Estimate Count: Review the number of cost estimates that have been executed for the material in question. You can do this by navigating to the cost estimate display transaction (e.g., CK13N) and checking the history.

    2. Delete Unnecessary Cost Estimates: If there are old or unnecessary cost estimates that are no longer needed, consider deleting them to free up space for new estimates. This can be done using transaction CK14N (Delete Cost Estimates).

    3. Review Configuration: Check the configuration settings for the costing variant and material master to ensure that they are set up correctly. You may need to consult with your SAP configuration team to adjust any limits or settings.

    4. Consult Documentation: Review SAP documentation or notes related to the CK596 error for any specific recommendations or patches that may address the issue.

    5. Contact SAP Support: If the issue persists after trying the above solutions, consider reaching out to SAP support for further assistance. They may provide additional insights or solutions based on the specific context of your system.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CK13N (Display Cost Estimate), CK14N (Delete Cost Estimates), and CK40N (Create Cost Estimate).
    • Costing Variants: Understand the role of costing variants in the cost estimation process and how they can affect the execution of cost estimates.
    • Material Master Data: Ensure that the material master data is complete and accurate, as this can impact cost estimation.

    By following these steps, you should be able to address the CK596 error and continue with your cost estimation processes in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker