Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 580
Message text: Material &1 in plant &2 was costed with production version &3
In the cost estimate for material &V1& in plant &V2&, production
version &V3& was used to determine the quantity structure (BOM and
routing).
Production version &V3& is used to calculate the operation quantities
using material quantity calculation.
Error message extract from SAP system. Copyright SAP SE.
CK580
- Material &1 in plant &2 was costed with production version &3 ?The SAP error message CK580 indicates that a material in a specific plant has been costed using a particular production version. This message typically arises during the costing process in SAP, particularly when dealing with materials that have multiple production versions or when there are issues with the configuration of the material master data.
Cause: Production Version Not Defined: The production version specified in the error message may not be defined for the material in the plant. Costing Variant Issues: The costing variant used may not be set up correctly to handle the production version. Material Master Data: There may be inconsistencies or missing data in the material master record, particularly in the production version or costing views. Costing Run: The costing run may not have been executed correctly, or there may be issues with the costing data.
Solution: Check Production Version: Verify that the production version specified in the error message is correctly defined for the
Get instant SAP help. Sign up for our Free Essentials Plan.
CK579
Parallel processing: Costing results will be marked immediately
What causes this issue? You have specified that the costing run is to be executed with parallel processing.System Response The system creates packet...
CK578
Costs of cost element & cannot be assigned to any cost component
What causes this issue? In preliminary order costing or a confirmation, costs for cost element &V1& were calculated that could not be assigne...
CK581
Missing authorization for BOM
What causes this issue? During costing, the system checked for the authorization to explode a BOM. It did not find this authorization.System Response...
CK582
Mat. & plant & has no suitable cost comp. split (cost est w/o qty struc.)
What causes this issue? The system attempts to valuate material &v1& in plant &v2&. Because the <DS:DE.CK_EKALREL>With quantity...