Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 546
Message text: Future standard cost estimate for posting period &3 &4 is not marked
You are attempting to release the standard cost estimate for material
&v1& in plant &v2& for the future posting period &v3& of fiscal year
&v4&.
Although a standard cost estimate for the future posting period &v3&
&v4& was marked, this cost estimate does not have the costing status
<LS>VO</> (marked).
Because of this inconsistency, the standard cost estimate cannot be
released.
Cost the material again, mark the cost estimate, and release it.
Error message extract from SAP system. Copyright SAP SE.
CK546
- Future standard cost estimate for posting period &3 &4 is not marked ?The SAP error message CK546 indicates that a future standard cost estimate for a specific posting period is not marked. This typically occurs in the context of cost accounting and inventory management when you are trying to post transactions that rely on a standard cost estimate that has not been properly marked for use in the specified period.
Cause: Unmarked Cost Estimate: The standard cost estimate for the future period has been created but not marked. Only marked cost estimates can be used for postings. Incorrect Posting Period: The posting period you are trying to use may not align with the periods for which the cost estimate is valid. Cost Estimate Not Released: The cost estimate may not have been released or finalized, which is necessary for it to be marked.
Configuration Issues: There may be configuration issues in the controlling area or the material master that prevent the cost estimate from being marked.
Solution: Mark the
Get instant SAP help. Sign up for our Free Essentials Plan.
CK545
No current standard cost estimate found in posting period &3 &4
What causes this issue? You are attempting to release the standard cost estimate for material &v1& in plant &v2& for a future posting...
CK544
Your system has no costing type for the standard cost estimate
What causes this issue? You are attempting to release the standard cost estimate of a material for a certain posting period. However, no costing type...
CK547
No future standard cost estimate exists for posting period &3 &4
What causes this issue? You are attempting to release the standard cost estimate of material &v1& in plant &v2& for the future postin...
CK548
Error at destination &1
What causes this issue? Error "&v2&" occurred at destination &v1&. The error occurred while costing the block of materials ...
Click on this link to search all SAP messages.