Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 386
Message text: A routing of type & cannot be costed
Costing with quantity structure can only take routings into account if
they refer to a material.
Routings of type &V1& are ignored in costing.
Check your entry in the initial screen for costing or in the costing
view of the material master record.
Error message extract from SAP system. Copyright SAP SE.
CK386
- A routing of type & cannot be costed ?The SAP error message CK386 indicates that a routing of a specific type cannot be costed. This error typically arises during the costing process in the SAP system, particularly when trying to calculate the costs for a material or product based on its routing.
Cause: The error can occur due to several reasons, including: Routing Type: The routing type being used is not set up for costing. For example, certain routing types may be designated for planning purposes only and not for costing. Missing Data: There may be missing or incomplete data in the routing, such as missing operations, components, or work centers that are necessary for the costing process. Costing Variant Settings: The costing variant being used may not be configured to handle the specific routing type. Status of the Routing: The routing may be inactive or not released for use in costing. Plant Assignment: The routing may not be assigned to the correct plant or
Get instant SAP help. Sign up for our Free Essentials Plan.
CK385
Enter a routing group for routing type &
What causes this issue? You entered a routing that does not refer to a material. For the system to be able to identify the routing, you have to ente...
CK384
Costing variant & is not assigned to costing run
What causes this issue? Costing variant &V1& is not assigned to the costing run.How to fix this error? Select a valid costing variant using ...
CK387
No G/L account for & on &
What causes this issue? The G/L account determined automatically for external activities for material &V3& does not exist for the date &V...
CK388
Process cannot be costed with the cost estimate
What causes this issue? According to the material type, the object to be costed is a process.System Response Processes cannot be costed in material ...