Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 365
Message text: Costing variant & does not allow price update
Costing variant &V1& does not allow the prices in the selection to be
updated.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Choose a costing variant that allows the required prices to be
updated.
Error message extract from SAP system. Copyright SAP SE.
CK365
- Costing variant & does not allow price update ?The SAP error message CK365 typically indicates that there is an issue with the costing variant configuration or the settings related to the price update process in the Material Ledger. This error can occur during the costing process when the system does not allow a price update due to certain conditions not being met.
Cause of CK365 Error
Costing Variant Configuration: The costing variant may not be set up correctly to allow price updates. This includes settings related to price determination, valuation methods, and other parameters.
Material Master Settings: The material master record may not be configured to allow price updates. This can include settings in the accounting view or the material type.
Period Lock: The period for which you are trying to update prices may be locked. If the period is closed in the financial accounting module, price updates will not be allowed.
Costing Run Status: If a costing run is already in progress or has been completed, the system may prevent further price updates until the run is finalized.
Authorization Issues: The user may not have the necessary authorizations to perform price updates.
Solutions to CK365 Error
Check Costing Variant Configuration:
- Go to the configuration settings for the costing variant (Transaction code: OKKN).
- Ensure that the costing variant allows for price updates and that all necessary parameters are correctly set.
Review Material Master Settings:
- Check the material master record (Transaction code: MM03) to ensure that the accounting view allows for price updates.
- Verify that the material type is configured correctly.
Check Period Status:
- Use transaction code OB52 to check if the period is open for posting. If the period is closed, you may need to open it or wait until it is open again.
Finalize Costing Run:
- If a costing run is in progress, you may need to finalize it before attempting to update prices again. Use transaction code CK40N to manage costing runs.
Authorization Check:
- Ensure that the user has the necessary authorizations to perform price updates. This may involve checking roles and permissions in the user profile.
Related Information
Transaction Codes:
Documentation: Refer to SAP Help documentation for detailed information on costing variants and material valuation.
SAP Notes: Check for any relevant SAP Notes that may address specific issues related to the CK365 error.
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CK364
Costing variant & does not allow this update
What causes this issue? Costing variant &V1& does not allow this price to be updated.System Response The system issues an error message and ...
CK363
Plant & does not have a one-to-one assignment to its valuation area
What causes this issue? The selected plant &V1& does not have a one-to-one assignment to the valuation area.System Response The system issue...
CK366
Select at least one price to be updated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK367
Make either all entries or no entries for the planned price
What causes this issue? If you set this indicator for a planned price, you also have to specify the validity date and the view. If you do not set thi...
Click on this link to search all SAP messages.