How To Fix CK256 - No cost field for fixed costs has been defined


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 256

  • Message text: No cost field for fixed costs has been defined

  • Show details Hide details
  • What causes this issue?

    The <DS:GLOS.cost_rollup>cost rollup</> resulted in a cost element
    containing fixed costs that cannot be assigned in
    <DS:GLOS.cost_component_structure>cost component structure</> &v2&
    because <DS:GLOS.cost_component>cost component</> &v1& was only defined
    for variable costs in Customizing.

    System Response

    The fixed costs for the <DS:GLOS.cost_element>cost element</> can be
    neither assigned nor rolled up.

    How to fix this error?

    Go into Customizing for Product Cost Controlling and do the following:

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    Check the definition of cost component &v1& in cost component structure
    &v2&.
    To take the fixed costs into account, set the <LS>Fixed and variable
    costs</> indicator for the cost component.
    Check which cost elements are assigned to this cost component.
    Call up the cost element itemization for the material costed and for
    its BOM components, and check those cost elements that contain fixed
    costs.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CK256 - No cost field for fixed costs has been defined ?

    Cause: The SAP error message CK256 occurs when there is no cost field defined for fixed costs in the cost component structure.

    Solution: To resolve the SAP error message CK256, you need to define a cost field for fixed costs in the cost component structure. Follow the below steps to define a cost field:

    1. Go to transaction code KEPH.
    2. Select the relevant cost component structure.
    3. Click on the "Cost Fields" button.
    4. Select the "Fixed Costs" tab.
    5. Define a cost field for fixed costs.

    Related Information: The cost component structure is used to define the cost components that are used in product costing. The cost components are used to calculate the total cost of a product or service. The fixed costs are those costs that do not vary with the level of production or sales. These costs include rent, salaries, and depreciation. Defining a cost field for fixed costs in the cost component structure is essential for accurate product costing.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker