Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 220
Message text: Material/plant &/& can only be costed with unit costing
The material can only be costed in unit costing.
The <DS:DE.CK_EKALREL>With quantity structure</> indicator in the
costing view of the material master record is not set.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If you normally want to cost this material in a
<DS:GLOS.cost_estimate_with_quantity_structure>cost estimate with
quantity structure</>, set the <LS>With quantity structure</> indicator
in the material master record.
Error message extract from SAP system. Copyright SAP SE.
CK220
- Material/plant &/& can only be costed with unit costing ?The SAP error message CK220 indicates that the material/plant combination you are trying to cost cannot be processed using the current costing method. Specifically, it suggests that the material can only be costed using unit costing, which is a method that calculates costs based on individual units rather than aggregated costs.
Cause:
- Costing Type: The material is set up in a way that it can only be costed using unit costing. This typically happens when the material is configured for specific costing methods that do not allow for standard or other types of costing.
- Material Master Settings: The material master record may have settings that restrict the costing method. For example, it may be set to a specific valuation class or costing variant that does not support the costing method you are trying to use.
- Plant Settings: The plant settings may also restrict the costing method available for the material.
- Costing Variant: The costing variant being used may not be compatible with the material's configuration.
Solution:
- Check Material Master: Review the material master record for the material in question. Ensure that the costing type is set correctly and that it allows for the desired costing method.
- Costing Variant: Verify the costing variant being used. Make sure it is appropriate for the material and plant combination. You may need to create or modify a costing variant that supports the required costing method.
- Use Unit Costing: If the material is indeed set up for unit costing, you may need to perform the costing using the unit costing method. This can be done by selecting the appropriate costing type in the costing run.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on how to configure costing for materials and plants.
- SAP Notes: Check for any relevant SAP Notes that may address this issue or provide additional guidance.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in SAP Controlling (CO) and Material Management (MM).
Get instant SAP help. Start your 7-day free trial now.
CK219
No itemization exists for material & in plant &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK218
No cost component split exists for material & in plant &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK221
Material & in plant & has no accounting view
What causes this issue? Material &V1& in plant &V2& has no accounting data.System Response The system cannot cost a material that ha...
CK222
External operation & / & has no price
What causes this issue? The routing of the material you are attempting to cost has no price for external operation &v1& or suboperation &...
Click on this link to search all SAP messages.