Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 139
Message text: Cost estimate for marked period does not exist
Costing has to be carried out with costing type &V1&, version &V2&, and
valuation variant &V3&.
You must first cost the relevant assembly or material, or carry out the
relevant costing run in this period before you can mark the costing
results in the material master.
<DS:TRAN.CK11N>Create Material Cost Estimate</>
<DS:TRAN.CK40N>Create Costing Run</>
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CK139
- Cost estimate for marked period does not exist ?The SAP error message CK139, which states "Cost estimate for marked period does not exist," typically occurs in the context of cost accounting and product costing. This error indicates that the system is unable to find a cost estimate for a specific period that has been marked for processing or analysis. Causes: Missing Cost Estimate: The most common cause is that a cost estimate has not been created for the specified period. This can happen if the cost estimate was not run or if it was deleted. Incorrect Period Selection: The user may have selected a period for which no cost estimate exists. This could be due to a typo or misunderstanding of the period range. Costing Variant Issues: The costing variant used may not be configured correctly, or it may not be applicable for the selected period. Data Migration Issues: If data has been migrated from another system, there may be inconsistencies or missing
Get instant SAP help. Sign up for our Free Essentials Plan.
CK138
Marking for posting period & & not allowed
What causes this issue? You are attempting to carry out <DS:GLOS.marking>marking</> for period &V1& &V2&, but marking has...
CK137
Plant &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK140
Cost estimate has status & (marking not possible)
What causes this issue? You are attempting to mark the results of a standard cost estimate. However, this cost estimate has the status &V1&, ...
CK141
Costing not allowed across controlling areas
What causes this issue? A cost estimate across controlling areas is not possible. You can only carry out such a cost estimate if <LS>all</&g...
Click on this link to search all SAP messages.