Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 106
Message text: Costing run only possible for cost estimates belonging to company code
This costing run contains <DS:GLOS.costing_variant>costing variant</>
&V1&, whose organizational level is not the same as the company code.
&sys_admin&
The organizational level of this costing variant must be the same as
the company code. If you have authorization for Customizing, change the
organizational level for this costing variant.
Error message extract from SAP system. Copyright SAP SE.
CK106
- Costing run only possible for cost estimates belonging to company code ?The SAP error message CK106 indicates that a costing run is only possible for cost estimates that belong to a specific company code. This error typically arises when you attempt to perform a costing run (such as a cost estimate for a material) that does not match the company code associated with the cost estimate.
Cause:
Company Code Mismatch: The cost estimate you are trying to process is not associated with the company code you are currently working in. Each cost estimate is linked to a specific company code, and the system enforces this linkage to ensure that costing data is accurate and relevant to the financial reporting of that company code.
Incorrect Configuration: There may be a configuration issue where the cost estimates are not properly assigned to the correct company codes.
Data Entry Error: The user may have inadvertently selected the wrong company code or material during the costing run process.
Solution:
Check Company Code: Verify that the cost estimate you are trying to use is indeed associated with the correct company code. You can do this by checking the cost estimate in the relevant transaction (e.g., CK11N for creating cost estimates).
Create/Update Cost Estimate: If the cost estimate does not belong to the correct company code, you may need to create a new cost estimate for the correct company code or update the existing one to ensure it is linked to the appropriate company code.
Review Configuration: If you suspect a configuration issue, review the settings in the controlling area and ensure that the cost estimates are correctly configured for the relevant company codes.
Use Correct Transaction: Ensure that you are using the correct transaction codes and parameters that correspond to the company code you are working with.
Consult Documentation: Refer to SAP documentation or help resources for additional guidance on cost estimates and company code configurations.
Related Information:
If the issue persists after checking these aspects, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in controlling (CO) and costing processes.
Get instant SAP help. Sign up for our Free Essentials Plan.
CK105
Set the update indicator
What causes this issue? You are attempting to save the costing run without update parameters.System Response The costing run is not saved.How to fix...
CK104
Cost est. will be saved w/o itemization or cost element itemization
How to fix this error? Notify your system administrator.Error message extract from SAP system. Copyright SAP SE. ...
CK107
Check costing dates
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK108
Cost estimate will be saved without costing variants or costing dates
What causes this issue? You are trying to save a costing run without selecting the necessary costing variants of costing dates. Costing cannot be ca...
Click on this link to search all SAP messages.