Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 078
Message text: No materials were selected for the costing run
Either the system did not select any materials for the costing run, or
you have not flagged any low-level codes for the selected materials.
The system cannot carry out the costing run.
Choose <LS>Costing run -> Change</>.
If the <LS>Costing level overview</> function is
<ZH>active</>, choose this function and select the costing levels that
you want to cost, and save the costing run.
<ZH>not active</>, you must carry out selection, and possibly also
quantity structure determination.
Execute the costing run.
Error message extract from SAP system. Copyright SAP SE.
CK078
- No materials were selected for the costing run ?The SAP error message CK078 ("No materials were selected for the costing run") typically occurs during the costing run process in the Controlling (CO) module, particularly when using the product costing functionality. This error indicates that the system did not find any materials that meet the selection criteria for the costing run you are trying to execute.
Causes:
- Selection Criteria: The selection criteria defined for the costing run may be too restrictive, resulting in no materials being selected. This could include parameters like material type, plant, or valuation area.
- Material Status: The materials you are trying to cost may not be in a status that allows them to be included in the costing run (e.g., they may be marked as inactive or obsolete).
- Costing Variant: The costing variant used may not be set up correctly or may not include the materials you are trying to cost.
- Missing Master Data: Required master data for the materials (like BOMs, routings, or cost estimates) may be missing or incomplete.
- Date Range: The date range specified for the costing run may not include any relevant materials.
Solutions:
- Review Selection Criteria: Check the selection criteria you have set for the costing run. Ensure that they are broad enough to include the materials you want to cost.
- Check Material Status: Verify the status of the materials in question. Ensure they are active and available for costing.
- Validate Costing Variant: Review the costing variant settings to ensure they are configured correctly and include the necessary parameters for the materials.
- Ensure Master Data Completeness: Make sure that all required master data (BOMs, routings, etc.) is complete and correctly maintained for the materials you want to cost.
- Adjust Date Range: If applicable, check the date range for the costing run and adjust it to include the relevant materials.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or refer to SAP documentation for further troubleshooting steps.
Get instant SAP help. Start your 7-day free trial now.
CK077
No longer used
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK076
Costing run & & is being saved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK079
Date control & does not exist
What causes this issue? You are using a <DS:GLOS.costing_variant>costing variant</> that contains <DS:GLOS.date_control>date contro...
CK080
Material & plant &: BOM not active
What causes this issue? You are attempting to cost material &v1& in plant &v2&. The BOM for this material has a status that does not ...
Click on this link to search all SAP messages.