Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 039
Message text: The cost estimate is being saved
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CK039
- The cost estimate is being saved ?The SAP error message CK039, which states "The cost estimate is being saved," typically occurs during the process of saving a cost estimate in the Controlling (CO) module, particularly in the context of product costing. This error can arise due to various reasons, and understanding the cause is essential for finding a solution. Causes of CK039 Error Locking Issues: The cost estimate might be locked by another user or process. This can happen if multiple users are trying to access or modify the same cost estimate simultaneously. Incomplete Data: Required fields or data might be missing or incomplete in the cost estimate. This can include missing material master data, cost component structure, or other relevant information. Authorization Issues: The user may not have the necessary authorizations to save the cost estimate. This can be due to missing roles or permissions in the user profile.
Configuration Issues: There may be configuration problems in the costing variant
Get instant SAP help. Sign up for our Free Essentials Plan.
CK038
Lot size in material master is & &
What causes this issue? A lot size of &V1& &V2& was entered in the costing view of the material master record.System Response If you...
CK037
Lot size & & taken from costing view
What causes this issue? You have not specified a lot size for costing.System Response The system uses the lot size in the costing view of the materi...
CK040
Material & in plant & has no valuation data
What causes this issue? You are attempting to cost material &V1& in plant &V2&, but no valuation data has been been maintained for th...
CK041
Field overflow with material & plant &
What causes this issue? During material valuation, a field overflow occurred for material &V1& in plant &V2&. The system attempted to...
Click on this link to search all SAP messages.