Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 014
Message text: Error when converting the costing date --> posting period
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
The system cannot determine a posting period from the costing date.
&sys_admin&
If you have authorization for Customizing, correct the fiscal year
variant and the number of posting periods.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message CK014, which states "Error when converting the costing date --> posting period," typically occurs during the costing process in SAP, particularly when dealing with material valuation and cost estimates. This error indicates that there is an issue with the conversion of the costing date to the corresponding posting period, which can be caused by several factors. Causes of CK014 Error Invalid Costing Date: The costing date provided may not fall within an open posting period. If the costing date is set to a period that is closed for posting, the system will throw this error. Period Control Settings: The settings in the controlling area or company code may restrict the posting periods, leading to this error. Fiscal Year Variant Issues: If there are discrepancies in the fiscal year variant settings, it can lead to issues in determining the correct posting period.
Configuration Issues: Incorrect configuration in the material master or costing
Get instant SAP help. Sign up for our Free Essentials Plan.
CK013 Valuation variant & does not exist (please check your entry)
What causes this issue? <DS:GLOS.valuation_variant>Valuation variant</> &V1& has not been maintained.How to fix this error? Chec...
CK012 System error. Notify your system administrator
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK015 No valid strategy for &1 &2 &4 with valuation variant &3
&USE& No valid price could be calculated because none of the <DS:GLOS.valuation_strategy>valuation strategies</> in the <DS:GL...
CK016 Incorrect call for activity valuation in file RKIN
What causes this issue? A transfer parameter was incorrect (sy-subrc = &V1&)How to fix this error? Contact your system administrator.Error m...
Click on this link to search all SAP messages.