How To Fix CJ248 - Planned Start was determined automatically


CJ248 - Overview

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 248

  • Message text: Planned Start was determined automatically

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ248 - Planned Start was determined automatically ?
    The SAP error message CJ248, which states "Planned Start was determined automatically," typically occurs in the context of project management and project system (PS) modules. This message indicates that the system has automatically calculated the planned start date for a project or activity based on the scheduling parameters and dependencies defined in the project.
    
    Cause: Automatic Scheduling: The system uses the defined relationships (dependencies) between tasks and the available dates to automatically determine the planned start date. This can happen if: There are no manually entered start dates. The project is set to use automatic scheduling. The project has constraints or dependencies that dictate the start date. Missing Data: If certain required fields or data are missing (like predecessor tasks or resource availability), the system may default to an automatic calculation. Project Settings: The project settings may be configured to allow for automatic scheduling, which can lead to this message if the user attempts to manually set

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant