How To Fix CJ228 - You cannot move the root level WBS element.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 228

  • Message text: You cannot move the root level WBS element.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ228 - You cannot move the root level WBS element. ?

    The SAP error message CJ228, "You cannot move the root level WBS element," typically occurs when you attempt to move a Work Breakdown Structure (WBS) element that is at the root level of a project. In SAP, the root level WBS element is the highest level in the hierarchy of a project, and certain restrictions apply to it to maintain the integrity of the project structure.

    Cause:

    1. Root Level Restriction: The root level WBS element is the main project element, and moving it could disrupt the entire project structure.
    2. Hierarchy Integrity: SAP enforces rules to ensure that the hierarchy of WBS elements remains intact, preventing changes that could lead to inconsistencies.

    Solution:

    1. Check the Structure: Ensure that you are not trying to move the root WBS element. If you need to reorganize the project, consider moving lower-level WBS elements instead.
    2. Create a New WBS Element: If you need to change the hierarchy, you might need to create a new WBS element and then move the relevant lower-level elements under this new WBS.
    3. Use Project Management Tools: Utilize SAP Project System (PS) tools to manage WBS elements properly. You can use transaction codes like CJ20N (Project Builder) to visualize and manage the project structure.
    4. Consult Documentation: Refer to SAP documentation or help resources for guidelines on managing WBS elements and project structures.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ02 (Change WBS Element), and CJ03 (Display WBS Element).
    • SAP Notes: Check for any SAP Notes related to WBS management that might provide additional insights or updates regarding this error.
    • User Permissions: Ensure that you have the necessary permissions to make changes to the WBS elements, as restrictions may also be due to user roles.

    If you continue to face issues, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker