Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 183
Message text: Constraints for actual dates are not possible
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message CJ183, which states "Constraints for actual dates are not possible," typically occurs in the context of project management and controlling within SAP, particularly when dealing with project structures, such as WBS (Work Breakdown Structure) elements or network activities.
Cause:
This error usually arises due to one or more of the following reasons:
Date Constraints: The actual start or finish dates of a project or activity are being set in a way that conflicts with the defined constraints. For example, if you are trying to set an actual start date that is later than the planned finish date, or if the actual dates do not align with the scheduling constraints defined in the project.
Project Status: The project or WBS element may be in a status that does not allow for changes to actual dates. For instance, if the project is locked or if certain periods are closed for posting.
Incorrect Configuration: There may be configuration settings in the project management module that are not allowing for the actual dates to be updated as intended.
Missing Authorizations: The user may not have the necessary authorizations to change actual dates in the project.
Solution:
To resolve the CJ183 error, consider the following steps:
Check Date Entries: Review the actual start and finish dates you are trying to enter. Ensure that they are logically consistent with the project timeline and do not violate any constraints.
Review Project Status: Check the status of the project or WBS element. If it is locked or in a closed period, you may need to unlock it or open the period for posting.
Adjust Constraints: If there are specific constraints set on the project or activity, you may need to adjust these constraints to allow for the actual dates to be entered.
Authorization Check: Ensure that you have the necessary authorizations to make changes to actual dates. If not, contact your SAP administrator to obtain the required permissions.
Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on handling date constraints in project management.
SAP Notes: Check for any relevant SAP Notes that may address this issue. Sometimes, there are known bugs or issues that have been documented by SAP with recommended fixes.
Testing in a Sandbox: If possible, replicate the issue in a test environment to better understand the cause and test potential solutions without affecting production data.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP Project System for further assistance.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP error explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |
CJ182 Selected project objects cannot be deleted
What causes this issue? You have selected a project object that must not be del...
CJ181 The selected project object dates cannot be deleted
What causes this issue? You have selected a project object, whose dates cannot ...
CJ184 No forecast dates exist
What causes this issue? You have not entered forecast dates for one or more act...
CJ185 No dependent objects exist
What causes this issue? No dates have been passed on, since no subordinate obje...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.