Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 130
Message text: **************Project planning board***************************
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message CJ130 typically relates to issues encountered in the Project System (PS) module, particularly when working with the Project Planning Board. This error can arise due to various reasons, often related to project structure, data inconsistencies, or configuration issues.
Causes of CJ130 Error
Missing or Incomplete Data: The project or WBS (Work Breakdown Structure) element may not have all the required data filled in, such as dates, status, or other essential fields.
Authorization Issues: The user may not have the necessary authorizations to access or modify the project data.
Project Status: The project or WBS element may be in a status that does not allow for certain operations, such as being locked or completed.
Configuration Issues: There may be configuration settings in the Project System that are not set up correctly, leading to inconsistencies.
Data Consistency: There may be inconsistencies in the data, such as missing links between the project and its components.
Solutions to CJ130 Error
Check Project Data: Review the project and WBS element data to ensure all required fields are filled in correctly. Make sure that the project is not locked or in a completed status.
Authorization Check: Verify that the user has the necessary authorizations to access and modify the project data. This can be done by checking the user roles and authorizations in the SAP system.
Review Project Status: Ensure that the project or WBS element is in a status that allows for the desired operations. If it is locked, you may need to unlock it or change its status.
Configuration Review: Check the configuration settings in the Project System to ensure they are set up correctly. This may involve consulting with a system administrator or SAP consultant.
Data Consistency Check: Run consistency checks in the Project System to identify and resolve any data inconsistencies. This may involve using transaction codes like CJEN (for project structure) or CJ20N (for project planning).
Consult SAP Notes: Look for relevant SAP Notes that may address this specific error. SAP frequently releases notes that provide solutions or workarounds for known issues.
Related Information
Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ01 (Create Work Breakdown Structure), and CJ02 (Change Work Breakdown Structure) for managing projects.
SAP Documentation: Refer to the official SAP documentation for the Project System module for detailed guidance on project management and troubleshooting.
Community Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.
If the issue persists after trying the above solutions, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP error explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |
CJ129 &1: Indicator &2 cannot become &3
Self-Explanatory Message Since SAP believes that this specific error message is ...
CJ128 Enter a WBS number or an activity number
Self-Explanatory Message Since SAP believes that this specific error message is ...
CJ131 The object cannot be shifted vertically
Self-Explanatory Message Since SAP believes that this specific error message is ...
CJ132 Select a project object
Self-Explanatory Message Since SAP believes that this specific error message is ...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.