CJ108 - Project stock: invalid value or action


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 108

  • Message text: Project stock: invalid value or action

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ108 - Project stock: invalid value or action ?

    The SAP error message CJ108, which states "Project stock: invalid value or action," typically occurs in the context of project management and inventory management within SAP. This error is often related to issues with project stock, which is stock that is specifically allocated to a project.

    Causes of CJ108 Error

    1. Invalid Project Assignment: The project stock may not be correctly assigned to a valid project or WBS (Work Breakdown Structure) element.
    2. Incorrect Material Master Data: The material being used may not be set up correctly for project stock, or it may not be assigned to the correct valuation type.
    3. Stock Type Issues: The stock type may not be compatible with the action being performed (e.g., trying to perform a movement that is not allowed for project stock).
    4. Authorization Issues: The user may not have the necessary authorizations to perform actions related to project stock.
    5. Configuration Issues: There may be configuration issues in the system related to project stock management.

    Solutions to CJ108 Error

    1. Check Project Assignment: Ensure that the project stock is correctly assigned to a valid project or WBS element. Verify that the project exists and is active.
    2. Review Material Master Data: Check the material master data for the material in question. Ensure that it is set up for project stock and that the valuation type is correct.
    3. Validate Stock Type: Make sure that the stock type you are trying to use is appropriate for the action you are performing. For example, ensure that you are not trying to perform a movement that is not allowed for project stock.
    4. Authorization Check: Verify that the user has the necessary authorizations to perform the action related to project stock. This may involve checking user roles and permissions.
    5. Configuration Review: If the issue persists, review the configuration settings related to project stock in the SAP system. This may involve consulting with a functional consultant or SAP Basis team.
    6. Transaction Code Check: Ensure that you are using the correct transaction codes for the actions you are trying to perform. For example, using the correct transaction for goods movements related to project stock.

    Related Information

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), MIGO (Goods Movement), and MB1A (Goods Withdrawal).
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
    • Documentation: Review SAP documentation related to project stock management for best practices and troubleshooting steps.
    • Support: If the issue cannot be resolved, consider reaching out to SAP support or your internal SAP support team for further assistance.

    By following these steps, you should be able to identify the cause of the CJ108 error and implement a solution to resolve it.

    Artificial intelligence solution provided by tomco.ai.
    Disclaimer
    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Feature Free Access Free Trial
Basic SAP error explanation T-Code Explanation T-Code Explanation 2
Step-by-Step Usage Guide Step-by-Step Step-by-Step 2
Interactive SAP Coach Assistance Interactive SAP Interactive SAP 2
AI Troubleshooting for T-Code Errors AI Troubleshooting AI Troubleshooting 2

Related SAP Error Messages

Click the links below to see the following related messages:


SAP messages fall into 3 different categories: Error messages (message type = E), Warnings (W) or Informational (I) messages.

An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author