How To Fix CJ108 - Project stock: invalid value or action


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 108

  • Message text: Project stock: invalid value or action

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ108 - Project stock: invalid value or action ?
    The SAP error message CJ108, which states "Project stock: invalid value or action," typically occurs in the context of project management and inventory management within SAP. This error is often related to issues with project stock, which is stock that is specifically allocated to a project.
    Causes of CJ108 Error
    
    Invalid Project Assignment: The project stock may not be correctly assigned to a valid project or WBS (Work Breakdown Structure) element.
    Incorrect Material Master Data: The material being used may not be set up correctly for project stock, or it may not be assigned to the correct valuation type.
    Stock Type Issues: The stock type may not be compatible with the action being performed (e.g., trying to perform a movement that is not allowed for project stock).
    Authorization Issues: The user may not have the necessary authorizations to perform actions related to project stock.
    
    Configuration Issues: There may be configuration issues in the system related to

    Already have an account? Login here!


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker