Do you have any question about this error?
Message type: E = Error
Message class: CGPL_OBJECT_SERVICES - Project Planning - Object Services Message Class
Message number: 011
Message text: Higher-level planning element & is not loaded
The higher-level planning element is not loaded.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CGPL_OBJECT_SERVICES011
- Higher-level planning element & is not loaded ?The SAP error message CGPL_OBJECT_SERVICES011 indicates that a higher-level planning element is not loaded in the system. This typically occurs in the context of SAP's Advanced Planning and Optimization (APO) or similar planning modules where hierarchical planning structures are used.
Cause:
- Missing Data: The higher-level planning element (like a product hierarchy, location, or other planning object) has not been loaded into the planning area.
- Incorrect Configuration: The planning area may not be correctly configured to include the necessary higher-level elements.
- Data Transfer Issues: There may have been issues during the data transfer process from the source system to the planning area, leading to incomplete data.
- Master Data Issues: The master data for the higher-level planning element may not exist or may be incomplete.
Solution:
Load the Missing Data:
- Ensure that the higher-level planning element is loaded into the planning area. You can do this by executing the relevant data load process (e.g., using the transaction
/SAPAPO/LOADING
or similar).Check Configuration:
- Verify the configuration of the planning area to ensure that it includes the necessary higher-level planning elements. This may involve checking the settings in the SAP APO or the relevant planning module.
Review Data Transfer:
- Check the data transfer logs to identify any issues that occurred during the data load process. Look for errors or warnings that may indicate why the higher-level planning element was not loaded.
Validate Master Data:
- Ensure that the master data for the higher-level planning element exists and is complete. You can check this in the relevant master data transaction (e.g., product master, location master).
Re-run Planning Runs:
- After ensuring that the necessary data is loaded and configured correctly, re-run the planning runs to see if the error persists.
Related Information:
/SAPAPO/LOADING
, /SAPAPO/MC62
(for checking planning areas), and /SAPAPO/MC73
(for master data).If the issue persists after following these steps, it may be beneficial to consult with your SAP Basis or APO support team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
CGPL_OBJECT_SERVICES010
Higher-level planning element & cannot be changed
What causes this issue? The higher-level planning element is in display mode.System Response The system issues an error message and will not allow y...
CGPL_OBJECT_SERVICES009
Project &1 is already being processed by &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CGPL_OBJECT_SERVICES012
Adjacent planning element & cannot be changed
What causes this issue? The neighboring planning elements must be in the change mode as well.System Response The system issues an error message and ...
CGPL_OBJECT_SERVICES013
There are lower-level objects
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
Click on this link to search all SAP messages.