How To Fix /CFG/TR_PAR008 - Merge of transport request: &1 into target TR: &2 failed


/CFG/TR_PAR008 - Overview

  • Message type: E = Error

  • Message class: /CFG/TR_PAR -

  • Message number: 008

  • Message text: Merge of transport request: &1 into target TR: &2 failed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/CFG/TR_PAR008 - Details

  • The SAP error message /CFG/TR_PAR008 Merge of transport request: &1 into target TR: &2 failed typically occurs during the transport management process when there is an issue merging transport requests. This can happen for various reasons, including conflicts between the transport requests, missing objects, or inconsistencies in the transport directory.
    Causes:
    
    Conflicting Objects: The transport request you are trying to merge may contain objects that conflict with those in the target transport request.
    Missing Objects: Some objects that are referenced in the transport request may not exist in the target transport request.
    Transport Directory Issues: There may be inconsistencies or corruption in the transport directory or the transport management system.
    Authorization Issues: The user performing the merge may not have the necessary authorizations to perform the operation.
    Transport Layer Issues: The transport layer configuration may not be set up correctly, leading to issues during the merge process.
    
    Solutions:
    
    Check for Conflicts: Review the objects in both transport requests

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/CFG/TR_PAR008 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author