Do you have any question about this error?
Message type: E = Error
Message class: CF - PRT management messages
Message number: 309
Message text: Sequence & Operation/Activity &:
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CF309
- Sequence & Operation/Activity &: ?The SAP error message CF309 typically relates to issues in the context of production planning and control, particularly when dealing with sequences and operations in a routing or production order. The error message indicates that there is a problem with the sequence or operation/activity defined in the routing or production order.
Cause:
- Missing or Incorrect Sequence: The sequence number or operation/activity may not be defined correctly in the routing.
- Invalid Operation: The operation/activity referenced may not exist or may have been deleted.
- Routing Issues: There may be inconsistencies in the routing data, such as missing operations or incorrect dependencies.
- Configuration Issues: There could be configuration settings in the system that are not aligned with the routing or production order requirements.
Solution:
- Check Routing: Verify the routing for the production order. Ensure that all operations and sequences are correctly defined and exist in the system.
- Validate Operations: Ensure that the operations referenced in the error message are valid and have not been deleted or modified incorrectly.
- Review Dependencies: Check for any dependencies between operations that may not be satisfied, such as predecessor or successor relationships.
- Correct Configuration: If the issue is related to configuration, consult with your SAP configuration team to ensure that the settings align with the business processes.
- Recreate Routing: If the routing is corrupted or has inconsistencies, consider recreating it from scratch.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message CF309.
Related Information:
CA01
(Create Routing), CA02
(Change Routing), or CO01
(Create Production Order) to investigate and resolve the issue.If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CF308
PRT: item: & Equipment & is available
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CF307
PRT: item: & Equipment & is not available
What causes this issue? You are trying to use a PRT. However the current status of the PRT does not allow this usage.System Response The system issu...
CF310
All PRTs checked are available
What causes this issue? You have checked the PRT for availability. If this check was carried out at the order level, then all PRTs for the order, tha...
CF311
This entry combination is not valid.
What causes this issue? You have entered an invalid combination of objects.How to fix this error? Enter only one of each of the following objects as...