Do you have any question about this error?
Message type: E = Error
Message class: CE - CAPP messages
Message number: 329
Message text: No standard values have been calculated for operation & using CAPP
There are no CAPP-based standard values for this operation. For this
reason, no sub-calculations or characteristic values can be displayed.
Error message extract from SAP system. Copyright SAP SE.
CE329
- No standard values have been calculated for operation & using CAPP ?The SAP error message CE329 ("No standard values have been calculated for operation & using CAPP") typically occurs in the context of the Controlling (CO) module, particularly when dealing with the calculation of standard values for operations in the context of Computer-Aided Process Planning (CAPP). This error indicates that the system was unable to find or calculate standard values for a specific operation in a routing or work center.
Causes:
- Missing Standard Values: The most common cause is that standard values have not been defined for the operation in the routing or work center.
- Incorrect Configuration: There may be issues with the configuration of the CAPP system or the way it is integrated with the routing.
- Data Inconsistencies: There could be inconsistencies or missing data in the master data (like work centers, routings, or operations).
- Authorization Issues: The user may not have the necessary authorizations to access the standard values.
- CAPP Settings: The settings for CAPP may not be correctly configured, leading to the inability to calculate standard values.
Solutions:
Define Standard Values: Check the routing or work center for the operation in question and ensure that standard values are defined. You can do this by:
- Navigating to the routing or work center in SAP.
- Checking the operation details to see if standard values (like setup time, processing time, etc.) are filled in.
- If not, enter the necessary standard values.
Review CAPP Configuration: Ensure that the CAPP settings are correctly configured. This may involve:
- Checking the integration settings between CAPP and the routing.
- Ensuring that the CAPP system is properly set up to calculate standard values.
Check Master Data: Verify that all relevant master data is complete and consistent. This includes:
- Work centers
- Routings
- Operations
Authorization Check: Ensure that the user has the necessary authorizations to view and edit standard values. This may involve checking user roles and permissions.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on CAPP and standard value calculations.
Debugging: If the issue persists, consider debugging the process to identify where the calculation is failing. This may require technical assistance from an SAP consultant or developer.
Related Information:
Transaction Codes: Familiarize yourself with relevant transaction codes such as:
CA01
(Create Routing)CA02
(Change Routing)CR01
(Create Work Center)CR02
(Change Work Center)SAP Notes: Check SAP Notes for any known issues or patches related to CAPP and standard value calculations.
Training and Documentation: Consider training sessions or documentation on CAPP and standard value management in SAP to better understand the processes involved.
By addressing the above points, you should be able to resolve the CE329 error and ensure that standard values are correctly calculated for operations using CAPP.
Get instant SAP help. Start your 7-day free trial now.
CE328
The last selected method & has been processed
What causes this issue? The last last selected method is method &. This method has been processed.Error message extract from SAP system. Copyrig...
CE327
Method & has been calculated; continue with method &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CE330
Complete your entries
What causes this issue? You are trying to simulate a standard values calculation. However, there are no processes in the work center &V1&.How...
CE331
Select at least one sub-calculation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.