Message type: E = Error
Message class: CC - ECM: Messages
Message number: 064
Message text: No changes made to object with change number &
You want to display an object and have entered change number &V1&.
No changes have yet been made to this object with this change number.
Error message extract from SAP system. Copyright SAP SE.
CC064
- No changes made to object with change number & ?The SAP error message CC064 ("No changes made to object with change number &") typically occurs in the context of change management within SAP, particularly when working with change numbers in the Change Management (CM) module. This message indicates that an attempt was made to modify an object (like a material, BOM, routing, etc.) associated with a specific change number, but no actual changes were detected or made. Causes: No Modifications: The most common cause is that the user attempted to save changes to an object, but the system detected that no actual changes were made to the object. Incorrect Change Number: The change number provided may not be valid or may not correspond to the object being modified. Object Status: The object may be in a status that does not allow changes, or it may be locked by another user or process. Authorization Issues: The user may not have the necessary authorizations to make
Get instant SAP help. Sign up for our Free Essentials Plan.
CC063
Generation not supported for change object
What causes this issue? You see this error message in one of the following situations: RESET N1 The indicator which allows object management records ...
CC062
Object locked for processing with change number &
What causes this issue? You want to edit an object with change number &V1&. However, this change number contains the indicator which blocks t...
CC065
Status & not supported for change master
What causes this issue? Inconsistency of data exists between the change master status and the database.How to fix this error? Inform your system man...
CC066
Change master status & does not allow changes
What causes this issue? You want to create or change an object with the change number you entered. The change master for this number contains status ...
Click on this link to search all SAP messages.