Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CBRC_REGCHECK - Messages for Substance-Related Regulation Check
Message number: 287
Message text: Time overlap; plant &1 and stor. loc. &2 during period &3 to &4
There are time conflicts in the entries in the database.
Within a time interval, a bonded warehouse can only be created once.
INCLUDE CBRC_BW_CONFIG_EXAMPLE OBJECT DOKU ID TX
You changes will not be saved.
Resolve the time conflicts and end processing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CBRC_REGCHECK287
- Time overlap; plant &1 and stor. loc. &2 during period &3 to &4 ?The SAP error message CBRC_REGCHECK287 indicates a time overlap issue in the context of capacity planning or resource management. Specifically, it suggests that there is a conflict in the scheduling of resources (like plants and storage locations) for a specified period. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Overlapping Time Periods: The error occurs when there are overlapping time periods for planned activities or resources in the specified plant and storage location. This could happen if two or more activities are scheduled to occur at the same time, leading to resource contention.
- Incorrect Configuration: The configuration of the planning parameters or master data for the plant or storage location may not be set up correctly, leading to conflicts.
- Data Entry Errors: Manual entries in the planning or scheduling modules may have overlapping dates or times that are not valid.
Solution:
- Review Scheduled Activities: Check the scheduled activities for the specified plant and storage location during the indicated time period. Identify any overlapping entries and adjust the scheduling to eliminate conflicts.
- Adjust Planning Parameters: If the issue is related to configuration, review the planning parameters for the plant and storage location. Ensure that they are set up correctly to avoid overlaps.
- Data Correction: If the error is due to incorrect data entry, correct the entries in the relevant planning or scheduling transactions. Ensure that the start and end dates/times do not overlap.
- Use Transaction Codes: Utilize relevant transaction codes (like COHV, CO02, or others depending on the context) to review and adjust the planned orders or production orders.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on managing capacity planning and scheduling to avoid such overlaps.
Related Information:
By addressing the overlapping time periods and ensuring proper configuration and data integrity, you should be able to resolve the CBRC_REGCHECK287 error effectively.
Get instant SAP help. Sign up for our Free Essentials Plan.
CBRC_REGCHECK286
Plant &1 stor. loc. &2 is already bonded WH for the time period &3-&4
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
CBRC_REGCHECK285
Specify a plant
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CBRC_REGCHECK288
Regulation &1: plant &2, storage location &3 is a bonded warehouse
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CBRC_REGCHECK289
Cannot determine country for the one-time account &1
What causes this issue? The address in the purchase order &V2& was manually overwritten for the one-time account &V1&. The country ca...
Click on this link to search all SAP messages.