How To Fix CBP019 - No authorization to plan this model


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CBP - Message class for CBP

  • Message number: 019

  • Message text: No authorization to plan this model

  • Show details Hide details
  • What causes this issue?

    You have not been granted the authorization to plan this planning
    model.

    System Response

    The program has been cancelled.

    How to fix this error?

    Please contact your system administrator.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CBP019 - No authorization to plan this model ?

    The SAP error message CBP019, which states "No authorization to plan this model," typically occurs in the context of SAP Analytics Cloud (SAC) or SAP Integrated Business Planning (IBP) when a user attempts to access a planning model for which they do not have the necessary authorizations.

    Cause:

    1. Insufficient Authorizations: The user does not have the required permissions to access or plan the specified model.
    2. Role Assignment: The user may not be assigned to the correct role that includes access to the planning model.
    3. Model Configuration: The model may be configured in a way that restricts access to certain users or groups.

    Solution:

    1. Check User Roles:

      • Verify that the user has been assigned the appropriate roles that grant access to the planning model. This can typically be done by an administrator in the SAP system.
      • Ensure that the roles include the necessary authorizations for planning activities.
    2. Review Authorization Objects:

      • Check the authorization objects related to planning in the SAP system. Ensure that the user has the necessary authorizations for the specific model.
      • This may involve reviewing the authorization profiles and adjusting them as needed.
    3. Model Access Settings:

      • Review the access settings of the planning model itself. Ensure that the model is set up to allow access to the relevant user groups or individuals.
      • If necessary, modify the model's access settings to include the user.
    4. Consult Documentation:

      • Refer to the SAP documentation for specific details on authorization management and planning model configuration. This can provide insights into how to properly set up user access.
    5. Contact Support:

      • If the issue persists after checking roles and authorizations, consider reaching out to SAP support for further assistance. They can provide guidance based on the specific configuration of your system.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • User Training: Ensure that users are trained on how to access and use the planning models, including understanding the authorization requirements.
    • Audit Logs: Review audit logs to identify any changes made to user roles or model configurations that may have led to the authorization issue.

    By following these steps, you should be able to resolve the CBP019 error and ensure that users have the necessary access to the planning model.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant