How To Fix CBP012 - Press button if interactive planning is finished


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CBP - Message class for CBP

  • Message number: 012

  • Message text: Press button if interactive planning is finished

  • Show details Hide details
  • What causes this issue?

    You have called the planning window for an external planning system.

    System Response

    The external planning systems window has been launched.

    How to fix this error?

    After the finish of the planning with the external planning system's
    planning window, close the external system's window and proceed in SOP
    planning by pressing return.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CBP012 - Press button if interactive planning is finished ?

    The SAP error message CBP012 ("Press button if interactive planning is finished") typically occurs in the context of SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO) when a user is trying to execute a planning function or process that requires the completion of an interactive planning session.

    Cause:

    1. Incomplete Interactive Planning Session: The error usually indicates that the user has not completed the interactive planning session. This could mean that the user has not finalized their changes or has not pressed the appropriate button to indicate that they are done with the planning activities.
    2. Session Timeout: If the session has timed out or if there are unsaved changes, the system may prompt this error.
    3. User Interface Issues: Sometimes, the user interface may not reflect the current state of the planning session, leading to confusion about whether the session is complete.

    Solution:

    1. Complete the Interactive Planning: Ensure that you have completed all necessary planning activities. This may involve:

      • Reviewing and confirming all changes made during the session.
      • Pressing the appropriate button (often labeled "Finish" or "Save") to indicate that you are done with the interactive planning.
    2. Check for Unsaved Changes: If you have made changes, ensure that they are saved before proceeding. Look for any prompts or notifications indicating unsaved changes.

    3. Refresh the Session: If you suspect that the session is not reflecting the current state, try refreshing the page or logging out and back into the system.

    4. Consult Documentation: Refer to the SAP documentation or user manuals specific to the version of SAP you are using for any additional steps or troubleshooting tips.

    5. Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting SAP Notes for any known issues related to this error message.

    Related Information:

    • SAP Notes: Check SAP Notes for any updates or patches related to this error message. SAP frequently releases updates that may address specific issues.
    • User Training: Ensure that users are trained on the proper procedures for completing interactive planning sessions to minimize the occurrence of this error.
    • System Configuration: Sometimes, system configuration settings can affect how interactive planning sessions are handled. Ensure that your system is configured correctly for your planning processes.

    By following these steps, you should be able to resolve the CBP012 error and continue with your planning activities in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author