Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CB - PP-PI-PMA: Dialog Messages for Process Management
Message number: 201
Message text: Further processing not possible (contact system administrator)
During the authorization check for the object &V1&, an internal error
occurred. The selected function has not been carried out.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
INCLUDE 'NA_SYSVERW' OBJECT DOKU ID TX LANGUAGE E
INCLUDE 'NA_SYSVW_HINW' OBJECT DOKU ID TX LANGUAGE E
The error may be due to faulty authorizations.
Error message extract from SAP system. Copyright SAP SE.
CB201
- Further processing not possible (contact system administrator) ?The SAP error message CB201 ("Further processing not possible (contact system administrator)") typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with cost centers, internal orders, or other controlling-related transactions. This error indicates that there is an issue preventing the system from proceeding with the requested operation.
Possible Causes:
- Missing Master Data: The relevant master data (e.g., cost center, internal order) may not be set up correctly or may be missing.
- Authorization Issues: The user may not have the necessary authorizations to perform the action.
- Configuration Issues: There may be configuration settings in the controlling module that are not set up correctly.
- Status of Objects: The object (e.g., cost center, internal order) may be in a status that does not allow further processing (e.g., closed or locked).
- System Errors: There could be a temporary system error or inconsistency in the database.
Solutions:
- Check Master Data: Verify that all necessary master data is correctly set up and active. Ensure that the cost center or internal order exists and is valid for the period in question.
- Review Authorizations: Check the user’s authorizations to ensure they have the necessary permissions to perform the action.
- Configuration Review: Consult with your SAP configuration team to ensure that all relevant settings in the controlling module are correctly configured.
- Object Status: Check the status of the object you are trying to process. If it is closed or locked, you may need to change its status or consult with the responsible person.
- System Logs: Review system logs (transaction SLG1) for any additional error messages or information that could provide more context about the issue.
- Contact Support: If the issue persists, it may be necessary to contact your SAP support team or SAP directly for further assistance.
Related Information:
By following these steps, you should be able to identify the root cause of the CB201 error and take appropriate action to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
CB200
System error: status & for control recipe & in table &
What causes this issue? Due to an internal error, the status &V1& has been set for the control recipe &V2& in the buffer table &V...
CB151
Further processing not possible (contact system administrator)
What causes this issue? When numbers were assigned (number range object &V1&, number range &V2&), an internal error occurred. The ob...
CB202
No process instructions maintained for ctrl. recipe destination &
What causes this issue? No process instructions have been defined for the phases assigned to control recipe destination &V1&. For this reaso...
CB203
You do not have the authorization to create ctrl. recipes in plant &
What causes this issue? You do not have the authorization to create control recipes in plant &V1&. The system does not carry out the function...
Click on this link to search all SAP messages.