Message type: E = Error
Message class: CAP4 - APO Integration of Work Center and Capacity
Message number: 016
Message text: Generation time frame for external capacity is shorter than planning time
You have entered a generation period for the <ls>external capazity</>
that is smaller than the generation period of the resource in SAP APO.
The generation period for the available capacity of a resource in SAP
APO is defined using the <DS:DE.CRES_GEN_LC_FORWARD>Validity in the
Future</> of the <DS:DE.CRES_GEN_LC_BACKWARDS>Validtiy in the Past</>.
You specify the validity period of the <ls>external capacity</> using
the settings in C
the system generates the <ls>external capacity</> for 30 days in the
past and 600 days in the future.
Define the generation period for the <ls>external capacity</> so that
it is at least as large as the generation period of the available
capacity in SAP APO.
Error message extract from SAP system. Copyright SAP SE.
CAP4016
- Generation time frame for external capacity is shorter than planning time ?The SAP error message CAP4016 indicates that the generation time frame for external capacity is shorter than the planning time. This typically occurs in the context of capacity planning and scheduling in SAP, particularly when dealing with external resources or capacities.
Cause:
Mismatch in Time Frames: The error arises when the time frame defined for generating external capacity does not align with the planning time frame set in the system. This can happen if:
- The external capacity is defined for a shorter duration than the planning period.
- The planning parameters or settings are not correctly configured to accommodate the external capacity.
Configuration Issues: There may be issues in the configuration of the capacity planning settings, such as:
- Incorrect settings in the capacity planning profile.
- Misalignment between the production planning and capacity planning settings.
Data Entry Errors: Incorrect data entries in the master data for external capacities or planning parameters can also lead to this error.
Solution:
Review Time Frames: Check the time frames defined for both the external capacity and the planning parameters. Ensure that the generation time frame for external capacity is equal to or longer than the planning time frame.
Adjust Planning Parameters: If necessary, adjust the planning parameters in the system to ensure they align with the external capacity settings. This may involve:
- Modifying the planning horizon.
- Changing the settings in the capacity planning profile.
Check Master Data: Review the master data for the external capacity to ensure that all relevant fields are correctly filled out and that there are no discrepancies.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on capacity planning and external capacities. This can provide insights into best practices and configuration settings.
Testing: After making adjustments, perform tests to ensure that the error no longer occurs and that the planning process runs smoothly.
Related Information:
CM01
(Capacity Planning) or C223
(Change Capacity) to review and adjust capacity settings.By following these steps, you should be able to resolve the CAP4016 error and ensure that your capacity planning processes function correctly.
Get instant SAP help. Start your 7-day free trial now.
CAP4015
Change to resource type of resource &1
What causes this issue? You have changed the number of individual capacities from <zh>1</> to a higher value or you have set the <DS:D...
CAP4014
The use of "external capacity" is not activated in Customizing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CAP4017
Change to data is not provided for
What causes this issue? If a capacity has already been transferred to SAP APO and the corresponding resource is assigned to a model, data that alread...
CAP4018
Reset of "storage characteristics" is not provided for
What causes this issue? If a capacity was already transferred to SAP APO and the <DS:DE.CRES_STORAGE_CAPABLE>Resource has Storage Characteristi...
Click on this link to search all SAP messages.