How To Fix CAP4016 - Generation time frame for external capacity is shorter than planning time


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CAP4 - APO Integration of Work Center and Capacity

  • Message number: 016

  • Message text: Generation time frame for external capacity is shorter than planning time

  • Show details Hide details
  • What causes this issue?

    You have entered a generation period for the <ls>external capazity</>
    that is smaller than the generation period of the resource in SAP APO.
    The generation period for the available capacity of a resource in SAP
    APO is defined using the <DS:DE.CRES_GEN_LC_FORWARD>Validity in the
    Future</> of the <DS:DE.CRES_GEN_LC_BACKWARDS>Validtiy in the Past</>.
    You specify the validity period of the <ls>external capacity</> using
    the settings in C
    the system generates the <ls>external capacity</> for 30 days in the
    past and 600 days in the future.

    How to fix this error?

    Define the generation period for the <ls>external capacity</> so that
    it is at least as large as the generation period of the available
    capacity in SAP APO.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CAP4016 - Generation time frame for external capacity is shorter than planning time ?

    The SAP error message CAP4016 indicates that the generation time frame for external capacity is shorter than the planning time. This typically occurs in the context of capacity planning and scheduling in SAP, particularly when dealing with external resources or capacities.

    Cause:

    1. Mismatch in Time Frames: The error arises when the time frame defined for generating external capacity does not align with the planning time frame set in the system. This can happen if:

      • The external capacity is defined for a shorter duration than the planning period.
      • The planning parameters or settings are not correctly configured to accommodate the external capacity.
    2. Configuration Issues: There may be issues in the configuration of the capacity planning settings, such as:

      • Incorrect settings in the capacity planning profile.
      • Misalignment between the production planning and capacity planning settings.
    3. Data Entry Errors: Incorrect data entries in the master data for external capacities or planning parameters can also lead to this error.

    Solution:

    1. Review Time Frames: Check the time frames defined for both the external capacity and the planning parameters. Ensure that the generation time frame for external capacity is equal to or longer than the planning time frame.

    2. Adjust Planning Parameters: If necessary, adjust the planning parameters in the system to ensure they align with the external capacity settings. This may involve:

      • Modifying the planning horizon.
      • Changing the settings in the capacity planning profile.
    3. Check Master Data: Review the master data for the external capacity to ensure that all relevant fields are correctly filled out and that there are no discrepancies.

    4. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on capacity planning and external capacities. This can provide insights into best practices and configuration settings.

    5. Testing: After making adjustments, perform tests to ensure that the error no longer occurs and that the planning process runs smoothly.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as CM01 (Capacity Planning) or C223 (Change Capacity) to review and adjust capacity settings.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • User Forums: Consider visiting SAP community forums or user groups where similar issues may have been discussed, providing insights or solutions from other users.

    By following these steps, you should be able to resolve the CAP4016 error and ensure that your capacity planning processes function correctly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker