How To Fix CACSPRC050 - Delimitation date &1 does not match date in run number &2 (&3)


CACSPRC050 - Overview

  • Message type: E = Error

  • Message class: CACSPRC -

  • Message number: 050

  • Message text: Delimitation date &1 does not match date in run number &2 (&3)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CACSPRC050 - Delimitation date &1 does not match date in run number &2 (&3) ?
    The SAP error message CACSPRC050 typically relates to issues with delimitation dates in the context of a specific run number in the SAP system. This error often occurs in the context of SAP Controlling (CO) or SAP Project System (PS) modules, where date management is crucial for various processes such as planning, budgeting, and reporting.
    
    Cause: The error message indicates that there is a mismatch between the delimitation date specified in the system and the date associated with the run number. This can happen due to several reasons: Incorrect Date Configuration: The delimitation date set for a particular project or cost center does not align with the date used in the run number. Data Entry Errors: Manual entry errors when inputting dates or run numbers can lead to discrepancies. Changes in Project Structure: If there have been changes in the project structure or cost center configuration, it may affect the delimitation dates. System Settings: The system

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant