Do you have any question about this error?
Message type: E = Error
Message class: CACSPH - Period Management
Message number: 006
Message text: Chosen end date &1 is outside permitted period
The chosen end date &V1& for generating periods is outside the permitted
period.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Choose an end date that is within the effective validity period of the
matching version of the period rule.
Error message extract from SAP system. Copyright SAP SE.
CACSPH006
- Chosen end date &1 is outside permitted period ?The SAP error message CACSPH006, which states "Chosen end date &1 is outside permitted period," typically occurs in the context of planning or scheduling activities within SAP, particularly in modules related to project management, production planning, or similar areas where date ranges are critical.
Cause:
This error indicates that the end date you have selected for a particular activity, project, or planning element is outside the allowed or defined date range set in the system. This could be due to several reasons, such as:
- Configuration Settings: The system may have specific settings that restrict the date range for planning or scheduling activities.
- Project or Activity Status: The project or activity may have a defined start and end date that does not allow for the selected end date.
- Period Locking: The period for which you are trying to enter data may be locked or closed in the system, preventing any changes outside of the defined periods.
- Authorization Issues: Sometimes, user roles and authorizations may restrict access to certain periods.
Solution:
To resolve this error, you can take the following steps:
- Check Date Range: Verify the allowed date range for the activity or project you are working on. Ensure that the end date you are trying to set falls within this range.
- Review Configuration: If you have access, check the configuration settings related to planning periods in the relevant module (e.g., project management, production planning). Adjust the settings if necessary.
- Adjust Dates: If the end date is indeed outside the permitted period, adjust it to a valid date that falls within the allowed range.
- Consult with Admin: If you do not have the necessary permissions to change settings or if you are unsure about the allowed date ranges, consult with your SAP administrator or the relevant functional team.
- Check for Period Locking: Ensure that the period you are trying to enter data into is not locked. If it is, you may need to unlock it or wait until the period is open for changes.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CACSPH005
Error while determining end date of period generation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CACSPH004
Error while reading period rule
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CACSPH007
Specified period for generating periods is inconsistent
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CACSPH008
Maximum number of periods reached for period rule &1 (&2)
What causes this issue? The maximum number of periods has been reached for period rule &1 (&2).System Response The system issues an error me...
Click on this link to search all SAP messages.