How To Fix CACSMD167 - End date of commission contract must not be blank; enter Dec. 31, 9999


CACSMD167 - Overview

  • Message type: E = Error

  • Message class: CACSMD - Message Texts for Master Data

  • Message number: 167

  • Message text: End date of commission contract must not be blank; enter Dec. 31, 9999

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CACSMD167 - End date of commission contract must not be blank; enter Dec. 31, 9999 ?
    The SAP error message CACSMD167 indicates that the end date of a commission contract is not specified, and the system requires it to be set to a default value of December 31, 9999. This error typically occurs in the context of commission management within SAP, particularly when dealing with commission contracts in the SAP Commission Management (CACS) module.
    
    Cause: The error arises when: A commission contract is being created or modified, and the end date field is left blank. The system expects a valid end date to determine the validity period of the commission contract.
    Solution: To resolve this error, you need to ensure that the end date of the commission contract is properly set. Here are the steps to do so: Access the Commission Contract: Navigate to the transaction or screen where you are creating or editing the commission contract. Enter the End Date: Locate the field for the end date of the commission contract. Enter the date as December

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant