How To Fix CACSELT112 - Scheduling rule &2 is not assigned to contract &1


CACSELT112 - Overview

  • Message type: E = Error

  • Message class: CACSELT - ELT: Messages for Entitlement and Liability Transfer

  • Message number: 112

  • Message text: Scheduling rule &2 is not assigned to contract &1

  • Show details Hide details
  • What causes this issue?

    For the transfer of entitlement &v3& it was specified that the
    entitlements should be paid out on the same dates. This means that
    remuneration scheduling should be based on the same rule. However, the
    scheduling rule &v2& that was used to schedule the original entitlement
    is <ZH>not</> assigned to the receiving contract &v1&.

    System Response

    Transfer is not possible.

    How to fix this error?

    Assign scheduling rule &v2& to contract &v1&, or do not transfer the
    data. In this case the scheduling rule is redetermined.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CACSELT112 - Scheduling rule &2 is not assigned to contract &1 ?
    The SAP error message CACSELT112 indicates that a scheduling rule is not assigned to a specific contract. This error typically arises in the context of contract management or scheduling within SAP, particularly when dealing with service contracts or sales contracts that require specific scheduling rules for processing.
    
    Cause: Missing Assignment: The scheduling rule that is expected to be linked to the contract is not assigned. This could happen if the scheduling rule was not set up correctly or if it was deleted or modified.
    Configuration Issues: There may be issues in the configuration settings of the contract management module, leading to the absence of the necessary scheduling rules. Data Entry Errors: During the creation or modification of the contract, the scheduling rule may not have been selected or entered correctly.
    Solution: Check Contract Settings: Navigate to the contract in question and check the settings to see if a scheduling rule is assigned. If not, assign the appropriate scheduling

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant