How To Fix CACS_STD269 - Extended date &1 is too short: extension of contract &2 is not possible


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CACS_STD - Higher Level Messages for Standard Contract

  • Message number: 269

  • Message text: Extended date &1 is too short: extension of contract &2 is not possible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CACS_STD269 - Extended date &1 is too short: extension of contract &2 is not possible ?
    The SAP error message CACS_STD269 indicates that there is an issue with the extension of a contract due to the specified extended date being too short. This typically occurs in the context of contract management within the SAP system, particularly in the SAP Convergent Charging (SAP CACS) module.
    
    Cause: The error arises when the date you are trying to set for the extension of a contract is shorter than the minimum required duration for the extension. This could be due to: The extended date being set to a date that is too close to the current date. Business rules or configurations that define a minimum extension period that is not being met.
    Solution: To resolve this error, you can take the following steps: Check the Extended Date: Review the date you are trying to set for the contract extension. Ensure that it meets the minimum duration requirements defined in your system. Review Configuration Settings: If you have access

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker