Do you have any question about this error?
Message type: E = Error
Message class: C7 - Scheduling
Message number: 102
Message text: Backward scheduling (enter finish date)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C7102
- Backward scheduling (enter finish date) ?The SAP error message C7102, which states "Backward scheduling (enter finish date)," typically occurs in the context of production planning or project management within the SAP system. This error indicates that the system is expecting a finish date to be entered for backward scheduling, but it has not been provided.
Cause:
- Missing Finish Date: The primary cause of this error is that the user has not entered a finish date for the operation or task that is being scheduled.
- Backward Scheduling Settings: The system is configured to use backward scheduling, which requires a finish date to calculate the start date and other related scheduling parameters.
- Incorrect Configuration: There may be issues with the configuration of the scheduling parameters in the material master or production order.
Solution:
- Enter Finish Date: The most straightforward solution is to enter a finish date for the operation or task. This can usually be done in the production order or project management screen where the scheduling is being performed.
- Check Scheduling Parameters: Review the scheduling parameters in the material master or production order to ensure that they are set up correctly for backward scheduling.
- Use Forward Scheduling: If backward scheduling is not necessary for your process, consider switching to forward scheduling, which does not require a finish date.
- Review User Input: Ensure that the user is correctly inputting the required data in the appropriate fields. Sometimes, the error may arise from user oversight.
- Consult Documentation: Refer to SAP documentation or help resources for specific instructions on how to enter scheduling data correctly.
Related Information:
By addressing the missing finish date and ensuring proper configuration, you should be able to resolve the C7102 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
C7101
Forward scheduling (enter start date)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7100
**** Messages which are not written into the log
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7103
Capacity requirements calc. (enter start and finish date)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7104
Start date must not be later than finish date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.