Do you have any question about this error?
Message type: E = Error
Message class: C7 - Scheduling
Message number: 015
Message text: No capacity category maintained in work center for scheduling
No capacity category has been maintained for scheduling in the work
center specified in the operation.
Scheduling is carried out on the basis of an operating time from
00:00 hours to 24:00 hours.
Maintain the capacity category in the work center.
Error message extract from SAP system. Copyright SAP SE.
C7015
- No capacity category maintained in work center for scheduling ?The SAP error message C7015, "No capacity category maintained in work center for scheduling," typically occurs when the system is unable to find a defined capacity category for a work center during scheduling operations. This can hinder the scheduling of production orders or operations, as the system requires this information to allocate resources effectively.
Cause:
- Missing Capacity Category: The work center in question does not have a capacity category assigned. The capacity category is essential for determining how the work center's capacity is utilized during scheduling.
- Incorrect Configuration: The work center may be incorrectly configured, or the necessary settings may not have been completed.
- Data Inconsistency: There may be inconsistencies in the master data related to the work center or the routing.
Solution:
To resolve the C7015 error, follow these steps:
Check Work Center Configuration:
- Go to the transaction code
CR02
(Change Work Center).- Enter the work center ID and check the details.
- Ensure that a capacity category is assigned in the "Capacity" tab. If it is missing, you need to assign an appropriate capacity category.
Assign Capacity Category:
- If the capacity category is not maintained, you can add it by selecting the appropriate category based on your production requirements (e.g., machine, labor, etc.).
- Save the changes.
Review Routing and Production Order:
- Check the routing associated with the production order to ensure that it references the correct work center.
- Ensure that the production order is correctly set up and that all necessary data is complete.
Check for Data Consistency:
- Run consistency checks on your master data to ensure there are no other issues that might be causing the error.
Consult Documentation:
- If you are unsure about which capacity category to use, refer to SAP documentation or consult with your SAP functional consultant for guidance.
Related Information:
CR01
: Create Work CenterCR02
: Change Work CenterCR03
: Display Work CenterBy following these steps, you should be able to resolve the C7015 error and ensure that your work center is properly configured for scheduling.
Get instant SAP help. Start your 7-day free trial now.
C7014
No working/operating time maintained in work center for scheduling
What causes this issue? No operating time has been defined for the work center specified in the operation.System Response Scheduling is carried out ...
C7013
Time units are not fully defined
What causes this issue? The time units required for scheduling are not all defined (day, week, month, year, decade).System Response The scheduling r...
C7016
Calender not found
What causes this issue? You have maintained a calendar which is not defined in the system.System Response Scheduling is carried out using the Gregor...
C7017
No calendar specified
What causes this issue? You have not defined a calender in the work center nor in the operation.How to fix this error? INCLUDE 'NA_ALLG_MOEGLIC...