Message type: E = Error
Message class: C7 - Scheduling
Message number: 010
Message text: Sub-op.: Finish date is before start date, finish date = start date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C7010
- Sub-op.: Finish date is before start date, finish date = start date ?The SAP error message C7010 indicates that there is a problem with the scheduling of a sub-operation in a production order or a project. Specifically, the error states that the finish date of a sub-operation is set to be before its start date, which is logically incorrect. In this case, the finish date is equal to the start date, which also leads to a conflict in scheduling.
Cause: Incorrect Date Entry: The finish date for the sub-operation has been entered incorrectly, either manually or through a system error. Scheduling Conflicts: There may be a conflict in the scheduling logic, where the system is trying to schedule operations in a way that violates the time constraints. Dependencies: There may be dependencies or constraints set on the operation that are causing the finish date to be calculated incorrectly. System Configuration: There could be issues with the configuration of the production order or project that lead to incorrect
Get instant SAP help. Sign up for our Free Essentials Plan.
C7009
PRT: Finish date is before start date, finish date = start date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7008
Date is not defined in factory calendar
What causes this issue? The scheduling run determined a date which is not within the validity period of the factory calendar.System Response The sys...
C7011
Order: Finish dat is before start date, finish date = start date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7012
Scheduling terminated: No time unit defined for day
What causes this issue? The scheduling function could not calculate any dates because no time units are defined for the day.System Response Scheduli...
Click on this link to search all SAP messages.