Message type: E = Error
Message class: C7 - Scheduling
Message number: 001
Message text: Scheduling terminated: Check date and scheduling type
Scheduling was not carried out.
Please check the scheduling type as well as the start and finish dates.
For <ZH>forwards scheduling</> you must maintain the <ZH>basic start
date</>.
For <ZH>backwards scheduling</> you must maintain the <ZH>basic finish
date</>.
For <ZH>"today" scheduling</> you must maintain the <ZH>basic finish
date</>.
Error message extract from SAP system. Copyright SAP SE.
C7001
- Scheduling terminated: Check date and scheduling type ?The SAP error message C7001, which states "Scheduling terminated: Check date and scheduling type," typically occurs in the context of scheduling jobs or processes in SAP, particularly in the areas of production planning or project management. This error indicates that there is an issue with the scheduling parameters, such as the dates or the type of scheduling being used.
Causes:
- Invalid Dates: The start or finish dates specified for the scheduling are not valid. This could be due to dates being in the past, or not aligning with the project or production timelines.
- Scheduling Type Issues: The scheduling type selected may not be compatible with the current settings or the data being processed. For example, if a scheduling type requires certain prerequisites that are not met.
- Missing Data: Required data for scheduling, such as resources, capacities, or dependencies, may be missing or incorrectly configured.
- Configuration Issues: There may be configuration settings in the system that are not set up correctly, leading to scheduling failures.
- System Constraints: There may be system constraints or locks that prevent the scheduling from being executed.
Solutions:
- Check Dates: Review the dates entered for the scheduling. Ensure that they are valid and make sense in the context of the project or production process.
- Review Scheduling Type: Verify that the scheduling type selected is appropriate for the task at hand. If necessary, consult the documentation or system settings to understand the requirements for each scheduling type.
- Validate Data: Ensure that all necessary data is present and correctly configured. This includes checking for any missing resources, capacities, or dependencies that may be required for scheduling.
- Configuration Review: Check the configuration settings related to scheduling in the SAP system. Ensure that they are set up correctly and align with the business processes.
- Consult Logs: Look at the system logs or job logs for more detailed error messages that may provide additional context on why the scheduling failed.
- Test with Different Parameters: If possible, try scheduling with different parameters to see if the issue persists. This can help isolate the problem.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the C7001 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
C7000
**** Messages,which are written into the protocol
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C6888
Internal: &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7002
Scheduling terminated: Check lot size unit of measure
What causes this issue? The lot size cannot be converted into the routing's unit of measure.System Response INCLUDE 'NA_ALLG_NOVERARBEITUN...
C7003
Scheduling terminated: Check lot size unit of measure
What causes this issue? The lot size cannot be converted into the quantity unit of the library network.System Response INCLUDE 'NA_ALLG_NOVERAR...