How To Fix C5758 - Select another phase number, this one exists


SAP Error Message - Details

  • Message type: E = Error

  • Message class: C5 - Master Recipe

  • Message number: 758

  • Message text: Select another phase number, this one exists

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message C5758 - Select another phase number, this one exists ?

    The SAP error message C5758 ("Select another phase number, this one exists") typically occurs in the context of project management or production planning within SAP, particularly when dealing with phases in a project or production order.

    Cause:

    This error message indicates that the phase number you are trying to select or create already exists in the system. In SAP, each phase in a project or production order must have a unique identifier. If you attempt to assign a phase number that is already in use, the system will generate this error to prevent duplication.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Existing Phases: Review the existing phases in the project or production order to confirm that the phase number you are trying to use is indeed already assigned. You can do this by navigating to the relevant project or order and checking the list of phases.

    2. Select a Different Phase Number: If the phase number is already in use, you will need to select a different, unique phase number that is not currently assigned to any other phase in the project or order.

    3. Modify Existing Phase: If you intended to modify an existing phase rather than create a new one, ensure you are accessing the correct phase and making the necessary changes instead of trying to create a duplicate.

    4. Consult Documentation: If you are unsure about the phase numbering conventions or how to manage phases in your specific SAP environment, consult your organization's SAP documentation or reach out to your SAP support team for guidance.

    5. Check Authorizations: Ensure that you have the necessary authorizations to create or modify phases in the project or production order. Lack of proper permissions can sometimes lead to unexpected errors.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) or CO02 (Change Production Order) where you might encounter this error.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. SAP frequently updates its system, and there may be specific notes addressing this error.
    • User Training: If this error is common among users, consider providing training on how to manage phases effectively within SAP to prevent future occurrences.

    By following these steps, you should be able to resolve the C5758 error and continue with your project or production order management in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:
  • C5757 Enter a control recipe destination for phase &
    What causes this issue? You did not enter a control recipe destination for a phase. This is a required entry.How to fix this error? Please enter a ...

  • C5756 Enter a phase
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • C5759 Enter the number of an existing operation
    What causes this issue? You have entered a superior operation, but an operation with this number does not exist.How to fix this error? Please specif...

  • C5760 Mark as a phase
    What causes this issue? You have entered a superior operation without setting the phase indicator.How to fix this error? You can proceed in two ways...

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author