Do you have any question about this error?
Message type: E = Error
Message class: C5 - Master Recipe
Message number: 749
Message text: -
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C5749
- - ?The SAP error message C5749 typically indicates an issue related to the configuration of the system, particularly in the context of the SAP Controlling (CO) module. The error message often arises when there is a problem with the assignment of cost centers, internal orders, or other controlling objects.
Cause:
The specific cause of error C5749 can vary, but it generally relates to one of the following issues:
- Missing Configuration: The cost center or internal order may not be properly configured or may not exist in the system.
- Incorrect Assignment: There may be an incorrect assignment of cost elements or controlling objects.
- Authorization Issues: The user may not have the necessary authorizations to access or modify the relevant controlling objects.
- Data Inconsistencies: There may be inconsistencies in the master data or transaction data related to the controlling objects.
Solution:
To resolve the C5749 error, you can take the following steps:
- Check Configuration: Verify that the cost center or internal order is correctly configured in the system. Ensure that it is active and properly assigned to the relevant controlling area.
- Review Assignments: Check the assignments of cost elements and ensure that they are correctly linked to the cost centers or internal orders.
- Authorization Check: Ensure that the user has the necessary authorizations to access and modify the relevant controlling objects. You may need to consult with your SAP security team.
- Data Consistency: Run consistency checks on the master data and transaction data to identify and correct any inconsistencies.
- Consult Documentation: Refer to SAP documentation or notes related to error C5749 for any specific guidance or patches that may be applicable.
Related Information:
If the problem persists after following these steps, it may be beneficial to engage with your SAP support team or a consultant who specializes in SAP Controlling for further assistance.
Get instant SAP help. Start your 7-day free trial now.
C5709
Materials is available in the material list more than once
What causes this issue? One material exists several times in the material list. You have assigned this material to the same operation or phase more t...
C5708
Res. & does not exist in plant &. Sec.res. for op. & was copied w/o res.
What causes this issue? The template you want to copy contains resource &V1& as the secondary resource assigned to operation &V3&. Ho...
C5750
Phases
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C5751
Select an operation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.